ShandongCustomized hydraulic lifting platformManufacturing costs

announcer:hp695HP135175170 release time:2024-06-27 22:58:52

the arrival time is within 30 minutes.

Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Shandong.In this machine, there will be electric brushes, and the parts between the brushes must be kept clean. Regular inspections are also required between the various bearings inside the machine, especially when adding butter to the bearings. If the butter is insufficient, it will cause severe wear and tear during the operation of the bearings, affecting the service life of the machine. There are various wires and cables inside the machine, and after a period of use, it is necessary to inspect the wires and cables. If any damage is found to the wires and cables, they should be tightened. Some screws must meet certain torque requirements. In the absence of relevant professional equipment, you can use professional equipment to tighten the screws at the repair shop. It is necessary to ensure that the screws meet the corresponding torque requirements.

The inconsistent production dimensions of the hydraulic lifting platform support rods are a quality defect of the lifting platform equipment itself. It is recommended that the manufacturer replace them, as the probability of this situation occurring is relatively low.

.Regularly check the connection of each part of the hydraulic elevator, and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure, and all connecting shafts must have split pins and be sufficient.

After careful inspection, it was found that it was mainly caused by two reasons

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor, a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).


ShandongCustomized hydraulic lifting platformManufacturing costs



The daily maintenance of guide rail type lifting equipment should pay attention to regular inspection and maintenance, eliminate hidden dangers, eliminate faults, and achieve these benefits for improving work efficiency, extending equipment service life, and ensuring the safety performance of the elevator.

The cleaning of the elevator manufacturer requires that all parts of the elevator should be kept free of oil sludge, dirt and dust, especially the air, fuel and oil filter of the engine should be checked and cleaned according to the specified time to prevent impurities from entering the cylinder and oil passage, so as to accelerate the wear of moving parts. Elevator manufacturers suggest developing some maintenance systems. The regular maintenance system is based on the wear and service life of mechanical components, as well as the wear and tear patterns of oil and liquid. The maintenance system mainly determines the maintenance needs of the machinery based on the operating hours of the machinery, which has also become the planned expected maintenance system.

The boxes and distribution boxes of hydraulic elevators should be kept clean regularly, and dust on electrical equipment should be promptly cleaned.

Excellent quality.The sinking of a cargo elevator is a phenomenon where the table surface drops due to gravity after a certain period of time when it rises to a designated position. Of course, this problem is definitely abnormal. So how can we solve it? The first step is to identify the cause. Below, the editor summarizes the ultimate solution.

When personnel enter the interior of the lifting platform for maintenance of outdoor elevators, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

How to maintain elevators in winter is one reason and the primary reason. Many workers in other industries do not know that hydraulic elevators use different types of hydraulic oil in summer and winter. Often,ShandongLarge hydraulic lifting platform, at low temperatures,ShandongSelf propelled hydraulic lifting platform, the hydraulic oil used in summer can become, or even freeze. After entering low temperatures in winter it is important to remember to replace hydraulic oil containing antifreeze, which is suitable for working at low temperatures.


ShandongCustomized hydraulic lifting platformManufacturing costs



Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period, it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn,ShandongSmall hydraulic lifting platform, there is no need to worry in the early stage. If there are no major problems run it several times more. After the running-in, if there is noise for a long time and no signs of fading the noise will naturally disappear. However, please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.

The cheapest.Before using the machine, the staff should carefully inspect the hydraulic and electrical systems to ensure that there are no leaks or bare leaks before use.

Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

The application scenarios of mobile elevators may require several or even dozens of passenger elevators in some office buildings and hospitals. In order to increase the speed, efficiency, and usable area of electric elevators, with each group responsible for a portion of the floors, and make different adjustments and scheduling based on the usage mode of different floors at different times.

Shandong.After careful inspection, it was found that it was mainly caused by two reasons

High altitude work requires the use of tool bags, and heavier and larger high-altitude work tools should be hung on stable components and cannot be placed randomly to avoid the occurrence of high-altitude falling accidents.

Remove and disassemble the hydraulic lift cargo elevator lowering valve, blow out the plunger with compressed air, then install it and reinstall it.