Jade MountainOil immersed transformer 50KVACreate unique brand innovation

announcer:hp122HP117294921 release time:2024-06-27 22:45:16

it is necessary to resolutely prevent the invasion of dirt such as rain

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, snow, wind and sand.

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Jade Mountain.In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

.What is the wiring mode of dry-type transformer?

The switching power supply lacks one phase of power;

Equipped with a temperature controller, platinum thermistor (pt10) is placed beside the embedded hole on the top of the low-voltage solenoid coil to test the winding resistance temperature rise of the transformer, stop the cooling centrifugal fan, set up common problem alarm, overtemperature alarm and overtemperature tripping effect, and provide reliable overvoltage protection machinery and equipment for the dry test transformer, so as to test the safety performance of the transformer operation.


Jade MountainOil immersed transformer 50KVACreate unique brand innovation



Dry type transformer factory

Transformer is

The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.

Good reputation.The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min,Jade MountainProtection grade of oil immersed transformer, and the time interval of each closing shall not be less than 5min.

Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, welding leakage test and NDT technology, surface treatment process and quality standards,Jade MountainPrice of scb11 series dry type transformer, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube,Jade MountainStructure of 35 kV oil immersed transformer, carry out it twice, and then draw the oil sample.


Jade MountainOil immersed transformer 50KVACreate unique brand innovation



Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

How much does it cost?.Noise solution of dry-type transformer

A kind of power engineering equipment that converts the working voltage and current according to the basic law of magnetic effect of current. In the whole process of power transmission and transformation of power engineering, it is necessary to carry out voltage transformation and blood pressure reduction according to the transformer to reduce the loss of electromagnetic energy in the whole process. Therefore, the power consumption of the processing plant is all connected with 10kV switching power supply, which is converted into bottom voltage electromagnetic energy through transformer.

Wiring mode of dry-type transformer:

Jade Mountain.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet and then take the oil sample.

In specific daily life