AmsterdamChanging manual hydraulic lifting to electric hydraulic liftingWhere is the bottom of the price for resumption of work indefinitely?

announcer:hp695HP135175170 release time:2024-06-25 13:23:36

After careful inspection, it was found that it was mainly caused by two reasons

The daily maintenance of guide rail type cargo elevators should ensure that the transmission position where the grease nipple is located needs to be lubricated twice a month. For areas where grease cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

Amsterdam.Having a high social status, it has now become an irreplaceable part of our mainstream goods. And the hydraulic pump station is the heart position of the lifting machinery, which extremely tests the professionalism and attention of the operator. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at several common sense issues: the elevator manufacturer's point is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, as long as these problems are not very serious, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, causing unnecessary casualties; 2. Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, once the relief valve is adjusted, it may cause abnormal operation of the hydraulic system, causing unnecessary damage to people, machines, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

Regular inspection and maintenance, eliminating hidden dangers, extending equipment service life, as overloading can increase the burden on the motor and in severe cases, cause the motor to burn out.

Staying below high-altitude work sites is prohibited, and safety nets or other protective devices should be installed below the work site to avoid injury from falling objects.

When using the distribution box, the electric leakage switch meets the requirements for construction elevators. If the fixed elevator installed is variable frequency, the selection of the leakage switch should be compatible with the frequency converter.


AmsterdamChanging manual hydraulic lifting to electric hydraulic liftingWhere is the bottom of the price for resumption of work indefinitely?



Do not adjust the solenoid valve on the motor arbitrarily. The solenoid valve is pre adjusted before leaving the factory, and random adjustment can easily cause internal pressure to increase or decrease. In severe cases, it can shorten the service life of the motor.

Many people believe that the mechanical strength of the elevator itself is relatively high when using it, so they did not strictly follow the installation method specified in the manual during the installation process. Little did they know that this would cause increased wear and tear of the parts and inflexible operation. In addition, they should pay attention to the installation precautions corresponding to the working environment and not be careless. Proper installation, use, and maintenance of elevators are important steps to ensure the normal operation of mechanical equipment. Therefore, when installing the elevator, please be sure to strictly follow the installation and use related matters below, and carefully assemble and use it.

The daily maintenance of guide rail type cargo elevators should ensure that the transmission position where the grease nipple is located needs to be lubricated twice a month. For areas where grease cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, it is prohibited to use the equipment.

Price.When installing, disassembling, and adjusting the rotating mechanism, it is important to ensure that the centerline of the reducer of the rotating mechanism is parallel to the centerline of the gear,Amsterdam10 meter hydraulic lifting platform, and its meshing surface is not less than 70%. The meshing clearance should be suitable.

The application scenarios of mobile elevators may require several or even dozens of passenger elevators in some office buildings and hospitals. In order to increase the speed, efficiency, and usable area of electric elevators, most high-rise buildings will divide electric elevators into arrays with each group responsible for a portion of the floors, and make different adjustments and scheduling based on the usage mode of different floors at different times.

Hydraulic oil should be kept clean and replaced every 6 months; When repairing, and cleaning the elevator, be sure to support the support rod.


AmsterdamChanging manual hydraulic lifting to electric hydraulic liftingWhere is the bottom of the price for resumption of work indefinitely?



Replace with new oil and do not intermittently use old oil,AmsterdamLifting platform hydraulic station, otherwise the moving parts in the system will accelerate wear.

management.The load capacity of goods and the tonnage of goods transported at once also affect the speed of lifting and lowering. Achieving the excellent value of the lifting platform for transporting goods is a guarantee of speed. If the weight is too heavy, it affects the speed. If the goods are too light, it also affects the normal transportation time.

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

The product has a sturdy structure, a large load-bearing capacity, smooth lifting simple and convenient installation and maintenance, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The editor will tell you about the level

Amsterdam.There are foreign objects inside the oil delivery pipe of the hydraulic lifting platform, which can cause uneven force distribution during the delivery of hydraulic oil,AmsterdamLifting hydraulic platform, only the power supply needs to be connected and all technical indicators meet the design requirements. When in use, and the hydraulic and electrical systems basically do not need to be adjusted.

Do not adjust the solenoid valve on the motor arbitrarily. The solenoid valve is pre adjusted before leaving the factory, and random adjustment can easily cause internal pressure to increase or decrease. In severe cases it can shorten the service life of the motor.