ChivakoaAmbient temperature requirements for dry-type transformerMain parameters of working principle

announcer:hp122HP117294921 release time:2024-06-23 15:45:39

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

Chivakoa.The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

After the oil is drained,Chivakoa50 kV box type transformer,ChivakoaRated current of distribution transformer, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary the human resources traction belt shall be used as a guide.

.Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

When the new oil filled by the power transformer and the oil sample that has just been considered are used, the resistance value of the grounding wire shall be measured accurately every two years.

How to reduce the failure of dry-type transformer?

Quality assurance.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Dry type transformer manufacturer

The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts with good strength and stiffness,ChivakoaDistribution transformer wiring group, which is conducive to adjusting the data and has a unique and neat style.


ChivakoaAmbient temperature requirements for dry-type transformerMain parameters of working principle



Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

Project scope.The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the resistance value of the grounding wire shall be measured accurately every two years.

Method and process of taking oil sample of power transformer

Chivakoa.Sound in case of phase failure

Protective measures for damping of dry-type transformer

The raw materials of Fushi blue can be used for bonding, so that the overall oil leakage of the connector can be greatly controlled; If the actual operation is convenient, the metal shell can also be bonded at the same time to achieve the purpose of leakage treatment.