JamondiS11 type oil immersed transformerCan accuracy deviation be allowed

announcer:hp122HP117294921 release time:2024-06-19 17:13:03

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

When the full load test is carried out and everything is normal, the load can be connected.

Jamondi.The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than 150kV, epoxy resin adhesive shall be used to pour dry-type transformers.

If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time use detection equipment to put out the fire immediately. In order not to expand the hazard,Jamondi660V to 380V three-phase transformer, the fire brigade must be notified.

.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

Brief introduction of zero line of power transformer

Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.


JamondiS11 type oil immersed transformerCan accuracy deviation be allowed



During no-load test run,JamondiScb18 dry type transformer, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

Automatic system of centrifugal fan: measure the temperature data signal according to the PT100 thermistor temperature measuring resistor of the embedded parts at the hot part of the bottom pressure winding. The transformer load expands and the operating temperature increases. When the winding temperature reaches 110 ℃, the system software automatically starts the centrifugal fan for refrigeration; When the winding temperature is as low as 90 ℃, the system software will automatically terminate the centrifugal fan.

Oil leakage at looper flange

Quality management.Solenoid insulation deterioration

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, and the vibration reduction solution is made at the cable bridge.

Direct labor.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil,JamondiWorking principle of power transformer, slow aging of insulation, short circuit fault between boxes two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Under normal conditions, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.

According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

Jamondi.For no-load impulse closing of transformer, pay attention to the following matters:

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore, it must also be changed to produce flexible connection.