victoria500KVA price of power transformer,

Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling it is necessary to resolutely prevent the invasion of dirt such as rain, snow, wind and sand.

The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

victoria.Visual inspection method for transformer inspection

Common problems of tap changer of power transformer

.How to reduce the failure of dry-type transformer?

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, resistance to short-circuit faults, common faults and impact. The work is diligent.


victoriaTechnical parameters of power transformerProduction steps and inspection requirements



Deterioration damage of transformer core insulation

Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, you must pay attention to the following points. Whether there is abnormal sound, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition,victoriaCommon models of power transformer, we should also pay attention to the following aspects.

Oil immersed transformer company

Welcome calls .The bearing capacity of each load is different. Generally dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

Caused by sand holes and cracks. For crack leakage,victoriaOperation and maintenance of dry type transformer, drilling stop hole is a good way to remove in-situ stress and prevent widening.

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, but there are many calculation methods.


victoriaTechnical parameters of power transformerProduction steps and inspection requirements



For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation, the goal of long-term treatment of leakage can be achieved.

Installation works.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

How is the quality level of dry-type transformer compared with foreign countries?

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

victoria.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

Power transformers are used in all walks of life

Brief introduction of zero line of power transformer