ChekhanovHydraulic small lifting platformProduct development trends and emerging categories

announcer:hp530HP141750488 release time:2024-06-11 14:20:36

After 1500 hours of elevator operation,ChekhanovCustomization of hydraulic lifting platform,ChekhanovManual hydraulic lifting platform, perform minor repairs to the mechanical and electrical systems.

The classification of lifting platforms is as follows: they are divided into mobile lifting platforms, automatic lifting platforms hydraulic lifting platforms, folding arm lifting platforms, and sleeve type lifting platforms according to their different modes of movement.

Chekhanov.All high-altitude operations must first build scaffolding or take measures to prevent teams from falling before boarding the vehicle bridge.

Hydraulic cargo elevators have been used in some high-altitude operations in recent years, and now some hydraulic cargo elevators are gradually mentioned as large machinery such as tower cranes, becoming a better choice for some high-altitude operations. However, there are still certain limitations, which have certain constraints.

.Regularly check whether each organization is functioning properly and whether there is noise. If problems are found, they should be promptly cleaned up.

Motor not running: Check all components of the motor for damage and check if there are any problems with the circuit and wiring.

After 1500 hours of elevator operation, perform minor repairs to the mechanical and electrical systems.


ChekhanovHydraulic small lifting platformProduct development trends and emerging categories



When installing, disassembling, and adjusting the rotating mechanism, attention should be paid to ensuring that the middle line is parallel to the middle line of the gear, and its meshing surface is not less than 70%. The meshing clearance should be suitable for the brakes of each mechanism. The clearance between the brake wheels should be regularly checked and adjusted to ensure its flexibility and reliability. There must be no dirt on the friction surface and it must be cleaned with gasoline or diluent.

Any work carried out at a height of 2 meters or above should be considered as work at height. Any work that can be done in advance on the ground must be done on the ground to minimize high-altitude operations.

If the circuit of the device is not disconnected or lowered, it is necessary to check the fuse for repair and replacement.

reform.After 1500 hours of elevator operation, perform minor repairs to the mechanical and electrical systems.

Mobile is a type of cargo heavy machinery equipment with good adjustment reliability and wide application fields suitable for automated production lines

When using hydraulic elevators, frequent inspections and maintenance should be carried out, which not only extends the service life of the hydraulic elevator, but also enables it to exert greater power during operation. Of course, hydraulic elevators also have their own regular repair times and protection methods: regular protection (carried out per shift).


ChekhanovHydraulic small lifting platformProduct development trends and emerging categories



Set up warning lights around the guide rail type hydraulic cargo elevator equipment, and the warning lights will light up to warn operators when loading and unloading materials. Idle personnel are prohibited from entering the operating range.

Affordable price.The precautions to consider when selecting a hydraulic lift oil tank include: considering the structure of the oil tank, the partition in the traditional oil tank cannot settle dirt. A vertical partition should be installed along the longitudinal axis of the oil tank, with a space left between one end of the partition and the end plate of the oil tank to connect the gaps on both sides of the partition. The inlet and outlet of the hydraulic pump are arranged on both sides of the partition at the disconnected end, so that the distance Z between the inlet and return oil is far, The hydraulic oil tank has more heat dissipation effect.

Lift and move horizontally with load to return to the loading position. For the transportation time of each item,ChekhanovHydraulic scissor type lifting platform, such repeated cycles are called cycles.

Voltage too low: Measure the starter voltage, with an allowable fluctuation range of± 10%.

Chekhanov.The installation personnel should have the qualification for installing hydraulic cargo elevators, carefully implement the special construction plan for installation and construction, and provide safety technical disclosure to the installation personnel for technical design.

The precautions to consider when selecting a hydraulic lift oil tank include: considering the structure of the oil tank, with a space left between one end of the partition and the end plate of the oil tank to connect the gaps on both sides of the partition. The inlet and outlet of the hydraulic pump are arranged on both sides of the partition at the disconnected end, so that the distance Z between the inlet and return oil is far, The hydraulic oil tank has more heat dissipation effect.

Regularly inspect the hydraulic lifting equipment of the upper and lower materials to ensure the safety of the rail type elevator and the safety of the material supply to the rail type lifting platform.