Curva DengCheQiao Manufacturing FactoryHow to test insulation

announcer:hp161HP196399230 release time:2024-06-10 17:21:24

Curva Fixed boarding bridge,

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

Curva .Please check if the power supply is stable and if there is a disconnection in the circuit. If everything is checked to be normal, it should be considered whether there is built-in power

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm, mainly considering safety and stability of use. For a long time, the manufacturer of the boarding axle has no turnover to avoid the price difference,Curva Design of boarding bridge, which is 20% higher than the market value! More than one ton is more expensive!

.For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

The electronic operation is very simple. With just one button, the air conditioning panel will automatically rise. Release the button, adjust the plate to reduce itself, and the hinge is used on the truck.

The hydraulic system adopts imported Italian brand products, with excellent performance and minimal maintenance. The oil cylinder lifting power system, inclined plate, top, and small oil cylinder operation, can be adjusted smoothly. The height adjustment plate is a selected decorative plate and profile, with a long service life. Various qualified manufacturers of boarding bridges are welcome to inquire by phone and sincerely invite cooperation!


Curva DengCheQiao Manufacturing FactoryHow to test insulation



Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface and foot of the slope, especially for the simple boarding bridge.

Remove and disassemble the lowering valve, blow the valve core clean with compressed air,Curva Manufacturing of boarding bridges, and then reinstall it.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.

Customer first.The hydraulic boarding bridge not only reduces labor intensity, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.


Curva DengCheQiao Manufacturing FactoryHow to test insulation



The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Credit guarantee.After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not working, the workbench should be lowered to a low position.

Keep the hydraulic boarding bridge system clean: regularly replace the oil and filter. Good hydraulic oil contains various additives that can prevent oil deterioration or blockage of system components. However, these additives will lose their effectiveness after a period of time. Therefore, the oil should be replaced regularly to ensure that the additives are effective. The filter can only absorb a limited number of dirt particles and other impurities from the oil. Replace the filter according to the recommended cycle to keep the system clean.

Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!

Curva .The hydraulic boarding bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods, and is our good helper. However, malfunctions during use are inevitable. What should we do when encountering a malfunction?

When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity try to eliminate it; If there is electricity