Senta10kV distribution transformerCorrect choice should pay attention to the problem

announcer:hp122HP117294921 release time:2024-06-07 20:46:55

Power transformer factory

& ldquo; YN, D11 & rdquo;, in which 11 indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at 12 o'clock, the phase voltage phasor of the secondary side is at 11 o'clock. That is, the safety and fire safety technical specifications on the spot shall be strictly implemented.

.(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Falling foreign matters and piercing

Naturally, if the oil immersed transformer catches fire, please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.


Senta10kV distribution transformerCorrect choice should pay attention to the problem



The insulating layer shaft and the connecting articles between the bell jar and the core shall be removed. If it is a hanging bell inspection,SentaStructure introduction of oil immersed transformer, the oil shall be pumped into the bottom of the bell jar before the bell jar can be removed.

The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation, offset, cracking, loosening, ignition smoke, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, visual inspection is one of the common methods of equipment inspection.

Difference between dry-type transformer and oil immersed transformer:

management.The noise of dry-type transformer comes from

The switching power supply lacks one phase of power;

When the full load test is carried out and everything is normal, the load can be connected.


Senta10kV distribution transformerCorrect choice should pay attention to the problem



Outdoor sampling shall be carried out in sunny days or dry weather with low environmental humidity. During sampling, it is necessary to resolutely prevent the invasion of dirt such as rain, snow,SentaModel of dry-type power transformer, wind and sand.

Management Department.When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and the voltage is constantly regulated. However because of certain necessity, the dry-type transformer will also boost voltage,SentaThe power supply of the transformer is, and the whole process of boosting voltage is very complex, and there are many principles.

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Senta.Manufacturing process and steps of dry-type transformer

The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

The no-load impulse closing working voltage shall not exceed 5% of the working voltage marked on the gear of the transformer, the closing frequency shall be 5 times, the delay time after power receiving shall not be less than 10min, and the time interval of each closing shall not be less than 5min.