InnisFour wheel electric elevatorDesign of pipe fittings

announcer:hp935HP175192871 release time:2024-05-28 12:19:43

InnisElectric pulley elevator,

Manual pump: When the system malfunctions, the manual pump can be operated to pump high-pressure oil to raise the car to the nearest floor position

Chain type electric lifting mechanism: With a good guiding mechanism, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.

Innis.Safety devices: Electric elevators for construction should be equipped with overload detection devices. When the load inside the cage exceeds 10% of the rated load capacity, the overload detection device will give a warning signal inside the cage,

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation and safety features. Please rest assured to use.

.The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops


InnisFour wheel electric elevatorDesign of pipe fittings



Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.

ranking.The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

The L distance depends on the selected wall mount model.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.


InnisFour wheel electric elevatorDesign of pipe fittings



The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

The cheapest.The full height landing door should meet the following requirements: the net height of the landing door opening should not be less than 0m. In special circumstances,InnisThree meter electric elevator,Innis6-12 meter fully automatic elevator, when the net height of the building entrance is less than 0m, it is allowed to lower the height of the lower door opening, but in any case, the net height of the lower door opening is not less than 8m. (Article 1 of GB26557-2011)

Savings, rate of increase and decrease. To ensure safe and reliable braking and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to prevent hydraulic pipelines from exploding and self locking safely. Installed overloaded voice control alarm

Protective measures should comply with regulatory requirements.

Innis.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.