HeilongjiangContainer fixed boarding bridgeThe machinery that can meet the needs of use

announcer:hp161HP196399230 release time:2024-05-16 19:39:21

but also doubles the efficiency of loading and unloading operations

The hydraulic boarding bridge not only reduces labor intensity, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.

To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, so it is not a major problem.

Heilongjiang.Advantages: The operation results are simpler, the operation is convenient, the stability is good, the safety is reliable, and has advantages. It is a common equipment for high-altitude operations.

When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value,HeilongjiangBoarding axle manufacturer, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

.The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.


HeilongjiangContainer fixed boarding bridgeThe machinery that can meet the needs of use



Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

When working at heights exceeding 1.5 meters, safety nets or safety belts must be used.

During the excavation process of the foundation pit of the simple boarding bridge,HeilongjiangContainer fixed boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.

Inspection environment.The width of the boarding bridge also requires a certain width of its own. However, if the width is too small it is not conducive to forklift loading and unloading of goods. If the width is too large,HeilongjiangMobile boarding bridge, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm, and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.

Connection for. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

During the application process of hydraulic boarding bridges, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.

Advantages: The operation results are simpler, the operation is convenient, the stability is good the safety is reliable, and has advantages. It is a common equipment for high-altitude operations.

Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings, cylinder pins and bearings, boom hinge shafts and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, or has foreign objects such as gravel. If found, making the boarding bridge better serve you.

Heilongjiang.Embedded boarding bridge, as the name suggests, refers to the boarding bridge embedded in the loading and unloading operation platform. The installed boarding bridge main board surface is horizontal with the upper plane of the loading and unloading operation platform. Completely integrated into the platform, it will not affect other operational tasks on the platform without loading and unloading operations. The boarding bridge with this type of structure is widely used and is also a relatively fast boarding auxiliary device. Its design is usually fully standardized as early as the structural design of buildings. We are a long-term manufacturer of boarding bridges. Welcome to inquire

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.