Kingston ParkOil immersed experimental transformerWhat are the matters needing attention in production

announcer:hp122HP117294921 release time:2024-05-16 12:52:52

It includes the performance and main uses of insulating layer materials, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

Before no-load impulse closing, the transformer shall be placed for 24h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.

Kingston Park.The equipment can eliminate the shortcomings found in the patrol inspection, clean the porcelain waterproof casing casing,Kingston ParkMaximum temperature of oil immersed transformer, remove and replace the cracked or brittle leather pad,Kingston ParkPower plant step-up transformer, check and tighten the node, replenish the oil with less oil, check and replace the silica gel of the breathing mask, etc.

Oil leakage at electric welding position

.Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Seal oil leakage


Kingston ParkOil immersed experimental transformerWhat are the matters needing attention in production



What is the important role of power transformer

Precautions for trial operation of power transformer manufacturers

Dry type transformer company

Welcome calls .The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct, which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.

How much is the power transformer

Therefore in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition,Kingston ParkPower transformer ranking, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, please connect all routes as far as possible to prevent other faults.


Kingston ParkOil immersed experimental transformerWhat are the matters needing attention in production



The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

Customer first.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

After the power transformer has been used for a long time, common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:

Power transformer factory

Kingston Park.Dry type transformer

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, please cut off the input switching power supply.

Operation of oil immersed transformer