ColumbusElectric elevatorQuality Control

announcer:hp935HP175192871 release time:2024-05-13 12:38:16

using side mounted oil cylinders

High lifting height, stable operation, noise free, easy maintenance, and longer service life.

Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

Columbus.Aluminum alloy lifting platforms can be divided into single column aluminum alloy, cargo elevator, double column aluminum alloy,ColumbusElevator electric 6 meters, three column and four column aluminum alloy. Can be used in factories, automated warehouses, municipal facilities, docks, buildings, and installations

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

.During the use period,ColumbusFour wheel electric elevator, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.


ColumbusElectric elevatorQuality Control



As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points,ColumbusElectric tricycle elevator, and can be controlled up and down floors to achieve safe use.

The cargo is 0.5m.

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications as specified in the above table.

discount.Work is essential, and the main protective accessories include safety belts, guardrails, protective covers, platforms and stairs, etc.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, it can cause the car to descend to the nearest floor position and open the door

Columbus.Setting requirements: The layout and installation of all cables and wiring of electric elevators should be able to prevent mechanical damage.

Horizontal lead screw mechanical electricity

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes