Common problems of tap changer of power transformer

Guaran.Step up process of dry-type transformer?

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

.The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time,GuaranDistribution transformer analysis, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

A specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?


GuaranS13-630 power transformerWhat are the technical parameters of



Oil leakage at looper flange

The rate of transformer is: n = P2 / p1x1o%, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally, it is about 50%, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

For no-load impulse closing of transformer, pay attention to the following matters:

How many?.Protective measures for damping of dry-type transformer

Oil leakage at looper flange

The voltage regulating tap changer is not in place or poor


GuaranS13-630 power transformerWhat are the technical parameters of



The power transformer is composed of two or more electromagnetic coils wound around the same transformer core. The winding resistance is connected according to the alternating electromagnetic field and works according to the basic principle of magnetic effect of current. The installation position of power transformer shall be considered to be conducive to operation, and a reliable area shall be selected at the same time. The rated capacity of the transformer must be effectively used when applying the transformer.

wholesaler.Power transformer factory

The visual inspection method is that the staff use human eyes to observe the appearance change of the visible parts of the operating equipment to find the abnormal conditions of the equipment, such as discoloration, deformation offset, cracking, loosening, ignition smoke,GuaranPower transformer maintenance contract, oil leakage, broken strand disconnection, short-circuit fault marks, hanging of dirty things, etching and turbidity, which can be inspected according to the visual inspection method. Therefore, visual inspection is one of the common methods of equipment inspection.

Oil immersed transformer

Guaran.For no-load impulse closing of transformer, pay attention to the following matters:

Oil leakage of porcelain pot and laminated glass oil level gauge

Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, during the installation of lightning rod please connect all routes as far as possible to prevent other faults.