When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer,AbbotsfordNormal operating temperature of dry-type transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage,AbbotsfordDry type transformer,AbbotsfordPower transformer price, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.

Abbotsford.When the output power P2 of the transformer is equivalent to the input power P1, the transformer will not cause loss. But in fact, part of the electromagnetic energy changes into energy and is lost. Because the electromagnetic coil is generally wound by copper core wire with insulating layer, it is called copper loss.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

.Power transformer plant

After the test, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and adjust the overcurrent protection value.

Then clamp the branch pipe with your thumb clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.


AbbotsfordParameters of 1250kva oil immersed transformerMeasures to be taken during the work



The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

The person in charge of a transformer manufacturer said that because of the hazards of raw materials and other factors, the cost of energy-saving transformers is significantly higher than that of traditional transformers, the market has not yet fully operated.

After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

resources.Oil leakage at electric welding position

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?


AbbotsfordParameters of 1250kva oil immersed transformerMeasures to be taken during the work



Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

Direct material.Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice, and then draw the oil sample.

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

When using the oil sample of the power transformer in operation it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

Abbotsford.Wiring mode of dry-type transformer:

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption which is not suitable for too large or too small.

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.