PumacilMobile hydraulic electric elevatorBefore operation, these general machinery manufacturing knowledge still need to be known

announcer:hp935HP175192871 release time:2024-05-08 13:09:20

When the wall bracket adopts non matching standard products, design calculations should be carried out.

From the above comparison, it can be seen that hydraulic electric lifting mechanisms have stable lifting, low noise, long service life, large load bearing capacity, and are relatively simple, making them suitable for use in stage equipment.

Pumacil.Stop.

The safety distance between the outer edge of the upper part of the landing door and the moving parts of the electric elevator during normal operation should not be less than 0.75m; If the rated speed is not greater than 0.7m/s, the safety distance can be 0.40m.

.High lifting height using side mounted oil cylinders,PumacilElectric elevator,PumacilRechargeable electric elevator, stable operation noise free, easy maintenance, and longer service life.

The verticality of the guide rail frame should meet the requirements of the specifications.

The scaffolding of the parking platform should be laid tightly and firmly.


PumacilMobile hydraulic electric elevatorBefore operation, these general machinery manufacturing knowledge still need to be known



News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

When using lifting equipment, the workbench should be kept in a horizontal state.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, and oil cylinder once a week to avoid dust and debris affecting normal operation.

original.Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

The landing door should meet the requirements of the specifications and achieve standardization.


PumacilMobile hydraulic electric elevatorBefore operation, these general machinery manufacturing knowledge still need to be known



When the landing door is closed, the full width of the lifting passage opening should be covered.

Quality improvement.The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Setting requirements: The up travel (limit) switch should be able to automatically stop the cage running at the rated speed before reaching the upper limit switch,PumacilMobile electric hydraulic elevator, but should not trigger the up travel (limit) switch as high

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

Pumacil.Setting requirements: The landing door should be standardized and tooled.

The quality of the standard section should comply with the product manual and specification requirements.

Before installation, the installation unit should confirm that the foundation, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.