ShuangluanElectric elevator factoryEffective innovation to change the landscape strategy

announcer:hp935HP175192871 release time:2024-05-07 13:32:11

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

The end height of the guide rail frame above the high attachment point should comply with the provisions of the user manual.

Shuangluan.We have all purchased the aluminum alloy electric elevator equipment,ShuangluanSelf propelled electric elevator, which is compact and easy to carry. Many garden style hotels, hospitals, airports and large parking lots also wear this equipment,

Safety performance: Electric elevators not only have the safety device of traditional traction elevators,ShuangluanElectric high-altitude elevator, but also have an overflow valve to prevent excessive system pressure during upward movement

.Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.


ShuangluanElectric elevator factoryEffective innovation to change the landscape strategy



The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.

And the decoration team is also using aluminum alloy electric elevators. What safety considerations should we consider during the use process? Many manufacturers have not clearly indicated it. Today, the mechanical editor will talk to you about aluminum alloys

Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, timely inspection of various functions is essential.

investment.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.


ShuangluanElectric elevator factoryEffective innovation to change the landscape strategy



Construction electric elevators should be equipped with cable guide frames and comply with regulatory requirements.

Production department.The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

Degrees, m/s.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator,Shuangluan8 meter electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Shuangluan.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.