Busgow FreiburgElectric lifting scissor liftWhat are the industries

announcer:hp935HP175192871 release time:2024-05-07 10:45:26

the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

Busgow Freiburg.The magnetic directional valve returns to the fuel tank. To ensure stable landing of heavy objects and safe and reliable braking

Electric elevators used in various places.

Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the landing speed does not change due to heavy objects. It is adjusted by the saving valve

From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

.Implementing multiple shifts of homework should fill in and submit records according to regulations.

The scissor type electric elevator is a widely used high-altitude operation special equipment. Its scissor mechanical structure ensures high stability of the lifting platform, wide working platform, and high bearing capacity, making the high-altitude operation range wider and suitable for multiple people to work simultaneously. It makes high-altitude operation more efficient and safer

The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder returns to the oil tank through the balance valve, hydraulic control one-way valve, throttle valve, and explosion-proof electromagnetic directional valve. To ensure a smooth descent of heavy objects and safe and reliable braking,Busgow FreiburgElectric six meter elevator,Busgow FreiburgElevator electric small, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the descent speed does not change due to heavy objects. The throttle valve regulates the flow rate and the ascending and descending speed.


Busgow FreiburgElectric lifting scissor liftWhat are the industries



It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, wide working platform, and high load-bearing capacity, 220V or 380V power supplies, diesel engines using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation, and safety features. Please rest assured to use.

Equal effect.

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Packaging strategy.High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.

The entrance of each landing platform must be equipped with a landing door, and the door bolt must be set on the side next to the construction electric elevator.


Busgow FreiburgElectric lifting scissor liftWhat are the industries



Installation verticality deviation guide rail frame erection height, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

Direct material.Acceptance: Concrete strength grade C30, strength testing report.

Unloading platform and attached electric construction platform, etc.

Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door

Busgow Freiburg.Protective measures should comply with regulatory requirements.

After the electric elevator passes the inspection,Busgow FreiburgGuide rail electric elevator, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

Protective measures should comply with regulatory requirements.