RotlingenMobile small electric elevatorhigh quality

announcer:hp935HP175192871 release time:2024-05-02 12:10:10

routine inspections should be carried out according to regulations and inspection records should be filled out.

When the wall bracket cannot meet the requirements of the construction site

Before operating the construction electric elevator, it should be designed and calculated separately.

Rotlingen.Fully autonomous lifting is widely used in various high-altitude work fields, such as factory maintenance,RotlingenElectric automatic elevator, airport maintenance, street light maintenance, and so on; How to use electric elevators correctly to extend the service life of the equipment and be flexible

Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.

When a rigid 5000mm2 square or circular flat surface is applied with a normal force of 600N to either side of the door, the door may not meet the above requirements, but safety should be maintained.


RotlingenMobile small electric elevatorhigh quality



Tank oil temperature protection: When the oil temperature in the tank exceeds the standard setting value, the oil temperature protection device sends a signal to suspend the use of the elevator. The elevator can only be started when the oil temperature drops

The cargo is 0.5m.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Quality recommendation.In addition to ground protective fences, low level doors can be used. Low level doors should meet the following requirements: the height of the door should be between 1m and 2m. And there should be at least protective railings, a half height middle crossbar, and a toe board at least 150mm above the ground.

Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Setting requirements: Each landing entrance should be equipped with a landing door,RotlingenElectric basket elevator, which should cover the opening with its full width, and should not open towards the lifting passage.


RotlingenMobile small electric elevatorhigh quality



The function of the lifting platform in a theater is roughly as follows: the main lifting platform arranged in the main performance area of the stage is mainly used to quickly change the scenery. Typically, with&quo; Product; In the music and dance theater stage arranged in a zigzag pattern, the lifting platform, side car platform, and rear car turntable perform a rapid transformation of the entire or partial scene. This arrangement allows for rapid switching of three full sets.

recommend.The net height of the landing door opening should not be less than 8m, and the difference between the net width and the outlet width of the cage door should not exceed 120mm. When the floor door is closed, except for the gap between the lower part of the door that should not exceed 35mm, the size of any through-hole and opening related to the distance between any door and adjacent moving parts, as well as the gap around the door or between parts, should comply with the provisions of Table 4 of 'Mechanical Safety - Safety Distance to Prevent Upper and Lower Limbs from Touching Dangerous Areas' GB23821-2009.

Check whether the sealing of components such as the oil cylinder, oil pipe, and motor of the aluminum alloy electric elevator is good and whether there is any air leakage.

The scaffolding of the parking platform should be laid tightly and firmly.

Rotlingen.For customers to use and operate the lifting platform for a long time,RotlingenSmall electric elevator, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

Setting requirements: The landing door should be standardized and tooled.

After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.