the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.

Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

Toledo.The top of the hanging cage is accessible; d) During installation/disassembly/maintenance/inspection of the device; e) Inside the hanging cage.

Secondly, for the replacement of hydraulic oil on the lifting platform,Toledo22ov electric elevator, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.


ToledoElectric spiral rod elevatorLead content determination method



Setting requirements: The guide rail should be rigid and flexible components such as wire ropes or chains should not be used.

Limit switches should be triggered directly by the movement of the suspension cage or its related components.

The pump body adopts an integrated pump station all equipped with imported high-quality pump stations, which can also be selected according to customer requirements to meet customer ideal requirements.

Product line.Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

The scaffolding of the parking platform should be laid tightly and firmly.

The foundation base or embedded parts should be fully embedded in the concrete foundation plate.


ToledoElectric spiral rod elevatorLead content determination method



The landing door should meet the requirements of the specifications and achieve standardization.

Installation works.Later, when there is a major malfunction of the lifting platform, it should not be used again to avoid accidents, personnel and property losses.

The stopper bearing of the mechanism is kept intact.

Construction electric elevators outside the lightning protection range

Toledo.When the wall bracket cannot meet the requirements of the construction site,ToledoSimple electric elevator, it should be designed and calculated separately.

Construction electric elevators outside the lightning protection range

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil,ToledoPortable electric elevator, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.