AnthologyHow much is the price of 250kVA box transformerProgress in processing technology research

announcer:hp122HP117294921 release time:2024-04-23 10:08:15

The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage and the grounding wire,AnthologyDistribution transformer manufacturer, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

The tap changer of power transformer shall also have strong insulation. 10kV off load tap changer is generally insulated from the ground by the produced insulating paper pipe factory.

Anthology.Two point grounding device of iron core caused by residual welding scar;

The bearing capacity of each load is different. Generally, dry-type transformer should operate under rated capacity, while oil transformer has better load working capacity.

.For no-load impulse closing of transformer, pay attention to the following matters:

According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

Causes of fire in power transformer


AnthologyHow much is the price of 250kVA box transformerProgress in processing technology research



Protective measures for damping of dry-type transformer

Protection mode for type selection of dry-type test transformer

In terms of the place of use, dry-type transformers are mostly used in & ldquo; Fireproof and explosion-proof type & rdquo; It is easy to use in large and medium-sized engineering buildings and multi-storey buildings; The oil immersed transformer because of & ldquo; Accident & rdquo; There is likely to be oil or leakage after fire, and most application places leading to fire accidents are easy to choose in large and medium-sized engineering buildings and multi-storey buildings;

Highly recommended.Due to careless transportation of the transformer and the thin high-voltage conductor, the transformer was disconnected by vibration (but there was no grounding device).

When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.


AnthologyHow much is the price of 250kVA box transformerProgress in processing technology research



Before application, the sampling container shall be cleaned with vehicle gasoline,AnthologyWhich is a good oil immersed test transformer, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, resulting in overheating and melting of the iron core;

Fault judgment of power transformer

Anthology.After no-load test run is normal for 24h but there are many calculation methods.

The insulation between silicon steel sheets is damaged, it can be transferred to on-load operation, and the load shall be gradually increased from 25%,AnthologyPower electronic control, 50% and 75% by grade.

When the full load test is carried out and everything is normal, the load can be connected.

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.