Lake ziwaiProduction process of oil immersed transformerHow to achieve

announcer:hp122HP117294921 release time:2024-04-22 12:18:18

Oil leakage of cast iron parts

When oil samples are used, resulting in overheating and melting of the iron core;

When the screw of the through core extruder holding the iron core of the transformer is loose, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer,Lake ziwai500 kV oil immersed transformer, while the working voltage,Lake ziwaiPower transformer model, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer,Lake ziwaiHow much is a 50 KVA box transformer, and can be solved until power failure.

.Before and after sampling, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.

The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.


Lake ziwaiProduction process of oil immersed transformerHow to achieve



Causes of fire in power transformer

Protection mode for type selection of dry-type test transformer

Method and process of taking oil sample of power transformer

consumption.The cross-sectional wiring of transformer input and output power plugs shall comply with the provisions of their current size; It should be equipped according to the current intensity of 2-5A / Min2.

In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.


Lake ziwaiProduction process of oil immersed transformerHow to achieve



Sound insulation treatment of main engine room the key to sound insulation treatment of dry-type transformer room is to start from three levels: window, ventilation and air exchange port and road surface, and apply sound insulation window, silencing cylinder, floating concrete floor damping pad and other sound insulation and noise reduction commodities to achieve sound insulation effect.

Process inspection.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Transformer manufacturer

Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly and the harm will not expand to a greater extent.

Lake ziwai.The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.

Fault judgment of power transformer