HilwanDistribution transformer installationGloss

announcer:hp122HP117294921 release time:2024-04-21 12:15:04

Dry type transformer manufacturer

For no-load impulse closing of transformer, pay attention to the following matters:

Hilwan.How to maintain dry-type transformer?

The hanging core of dry-type transformer is a vital part

.When we apply oil immersed transformer, we all know that it works with the help of oil. What if the oil immersed transformer is on fire? What countermeasures should we do?

When the whole process of winding wave of oil immersed transformer is calculated by using the marking method, the winding of oil immersed transformer is generally divided into multiple modules, and each module is replaced by an equivalent circuit, and its power circuit includes an inductance and vertical capacitance, a capacitance to ground or capacitance between windings, They also have mutual inductors between the inductors of each module, and collect the chain Internet as the equivalent power circuit of oil immersed transformer. The precision of the conclusion can completely meet the needs of practical projects.

Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite,HilwanOil immersed transformer monitoring, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure,HilwanOil immersed transformer temperature controller, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.


HilwanDistribution transformer installationGloss



For no-load impulse closing of transformer, pay attention to the following matters:

The fundamental reason for this kind of inaccuracy is that when the transformer & ldquo; Dalar trolley & rdquo; is considered according to the size of capacity utilization rate, the high-capacity transformer must be replaced by the small-capacity transformer with high utilization rate, and then the iron loss is considered and the copper loss is ignored. In fact for a certain load, the active power loss of small capacity exceeds that of large capacity The active power loss of the transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

Promise and keep promise.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.

Power transformer plant

What is the wavelength of oil immersed transformer?


HilwanDistribution transformer installationGloss



Oil leakage at looper flange

system.Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out and then Fushi blue raw materials shall be selected for sealing treatment.

Precautions for trial operation of power transformer manufacturers

When the full load test is carried out and everything is normal, the load can be connected.

Hilwan.The input and output three-phase power lines shall be connected to phase a,Hilwan10kV dry type test transformer, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example