Hu GewenRail-type lift platform How to bend

announcer:hp275HP127226562 release time:2024-04-21 11:42:41

According to calculations, when the support points of the beam type components are located along the length of 1/9L on both sides, the vibration resistance is relatively small, making it easy to obtain resonance and vibration effects with larger amplitudes. The geometric shape of the structure on the lifting foundation is similar to a long beam type component, and the structure is complex. Therefore, two support points should be taken on each side for time treatment.

Low failure rate: Due to the use of advanced hydraulic systems and good methods, the failure rate of elevator operation can be minimized. Low power consumption: When the hydraulic elevator descends, it is driven by the pressure generated by its own weight, and carefully inspect the steel structure, safety protection devices electrical devices, and transmission devices of construction elevators

Emergency descent: Handle operation or use of manual pressure relief and activation of emergency battery system to implement emergency descent function safety net.

.Drivers should be responsible for supervising the uniform distribution of items transported by the platform on the platform as much as possible to prevent partial loading and prohibit overloading. flat

When the lifting base plate descends, the safety net below immediately stops running and descends when encountering obstacles.

Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.


Hu GewenRail-type lift platform How to bend



Emergency stop: Press the emergency button switch to raise or lower the machine.

Since the antirust paint on the exterior layer will actively react with the oxygen in the air, especially in the cold sun or rainstorm climate, the reaction speed will be accelerated, so the exterior paint on the warehouse goods elevator will show signs of aging and then fall off every once in a while. Therefore, when maintaining the equipment of the lift table at ordinary times, pay attention to its storage, and try not to leave it outdoors, let alone in cool days or rainstorm

Applicable environment: Indoor or outdoor Applicable temperature: Safety device Safety rocker: When the equipment is running and rising,Hu GewenMobile boarding bridge 10 tons, the rocker will automatically prevent wheelchair platform.

Create brilliance.Heavy load capacity: protective plate form: 90° Or 180° Interchangeable configuration rocker working angle: 75° Drive method: hydraulic power unit drive or screw drive.

Folding arm lifting platform product features 01 Folding arm lifting platform High altitude operation platform 360 degree rotation without external power supply, can work across obstacles, lifting smoothly and safely. The curved arm lifting platform adopts a curved arm working arm and the scope and space of operation are not affected.

Whether the vibration aging treatment has achieved the results can be judged based on the parameter curve observation method.


Hu GewenRail-type lift platform How to bend



According to GB/T25712-2010, when one of the following situations occurs in the curve related to the aging frequency, it can be determined that the area covered by the effective zone of the vibration mode at that frequency has reached the aging effect: the curve rises and flattens; The curve rises, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.

discount.Jinchuang lifting platform product feature 01 is mainly used for high-altitude cargo transportation between floors. With a load capacity of 1-50 tons and a lifting height of 1-25 meters, a guide rail elevator, also known as a hydraulic elevator, can be installed indoors and outdoors. The lifting height is high and uses a side mounted oil cylinder, which runs smoothly, has low noise, and has a long service life. In case of a power outage, manual emergency descent can be used, convenient, fast, and practical. The pit depth is generally 15cm-30cm, and the top layer height is not affected, The 04 pump station can be customized according to the on-site environment, suitable for 2-3 floors of steel structures or concrete factories. Both the internal and external parts can be used. The 05 pump station adopts a joint venture pump station and an imported pump station from Italy. If the speed requirement is too high, a joint venture customized pump station can be used to meet the ideal delivery requirements. The 06 oil cylinder and seals are made of imported components, solving the problem of unstable oil pressure for customers The oil leakage problem of components 07. The oil cylinder is built into the platform 08. The heavy-duty steel wire rope wheel or weighted special chain ensures safety 09. The automatic insurance during the lifting process ensures vehicle safety 10. The synchronous device during the lifting process ensures that the vehicle may not overturn 11. The alarm setting before falling to the ground ensures the safety of the operator 12. The chain or steel wire rope fracture protection device 13. The hydraulic system pressure loss prevention protection device 14. The elevator special flat layer permanent magnet switch is selected, The leveling effect is good. 15. The distance between heavy and empty loads is small, and the leveling accuracy is high. 16. Standard elevator boards, LCD display call boxes, relevant wiring harnesses, and connectors are selected. Beautiful appearance, easy operation, visual display of the position of the elevator car on the floor, wiring harness connected using connectors, with automatic and manual options.

Check the safety interlocking equipment of the first cut door of the hanging cage

Outbound call form: Outbound call boxes are pre embedded or installed in a column style on the wall or ground near the parking floor above and below the platform, large welded structural components have the characteristics of complex morphology,Hu GewenSelf propelled mast lifting platform, large weight,Hu GewenOutdoor guide rail type lifting platform, large differences in residual stress size and distribution, and it is difficult to achieve good results using ordinary vibration aging technology. Therefore, it is crucial to develop a reasonable process. Therefore, they found Nanjing Juhang and our JH-700 vibration aging equipment and requested us to develop a complete vibration aging process.

According to GB/T25712-2010, when one of the following situations occurs in the curve related to the aging frequency, it can be determined that the area covered by the effective zone of the vibration mode at that frequency has reached the aging effect: the curve rises and flattens; The curve rises, then falls, and then flattens; The resonance frequency of the a-n curve after vibration is lower than that before vibration; The bandwidth of the a-n curve after vibration narrows compared to before vibration; The resonance peak of the a-n curve after vibration exhibits fission phenomenon; The curve flattens out after descent.

Vibration aging treatment and effect judgment: According to the aging process plan, after setting the support points and vibration pickup points of the workpiece, use a rigid fixture to fix the exciter on the workpiece, and use the manual function of the equipment to test the vibration. It is determined that around 5300 revolutions is the resonance frequency of the component. The amplitude generated by the eccentric gear of the exciter in the fourth gear can meet the vibration processing requirements of the foundation seat, so the excitation force is selected as the fourth gear.