StuttgartHand propelled electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Stuttgart.Normal operation starts. Click on this free download of construction technical information. Safety limit devices should be installed on electric elevators for construction, with upper and lower limit switches that are sensitive and reliable.

The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

Mechanical devices controlled by cage movement should not be used to open or close the landing door.


StuttgartElectric small hydraulic elevatorProduct classification related knowledge



With the continuous improvement of urbanization level in China, the number of high-rise buildings in urban areas has sharply increased, and the height of buildings has also continued to grow. This has created a demand for high-altitude lifting platform vehicles. Therefore, in order to meet the needs of the domestic market and the public, efforts will inevitably be made to design and produce high-altitude lifting platform vehicles.

Alarm devices can be divided into fixed and mobile platforms, rail type and scissor type (curved arm type) to distinguish between overload or equipment malfunction. Fixed types include: scissor lift cargo elevator, chain electric elevator, and installation

Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.

ranking.Secondly, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The safety notice board for construction electric elevators should be prominently placed on the hanging cage for the rated load capacity and rated number of passengers of the construction electric elevator. It is strictly prohibited to use construction electric elevators beyond the rated load capacity or rated number of passengers.

The verticality of the guide rail frame should meet the requirements of the specifications.


StuttgartElectric small hydraulic elevatorProduct classification related knowledge



The quality of the standard section should comply with the product manual and specification requirements.

Welcome calls .High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

If the set screw is loose,StuttgartElectric elevator lifting platform, be sure to pin it tightly to prevent accidents caused by the shaft pin falling off. Hydraulic oil should be kept clean and replaced every 6 months.

Spiral electric lifting mechanism: With all the functions of a regular lifting platform, the main feature is that the equipment occupies a small foundation pit and has a large stroke. The equipment has a height of only 200-500mm and a travel distance of up to 14m. It is particularly suitable for buildings with stages built on two or more floors due to space constraints.

Stuttgart.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

In addition to ground protective fences, a half height middle crossbar, and a toe board at least 150mm above the ground.