ShuangluanFixed hydraulic pressure for lifting platformIs there still room for development?

announcer:hp391HP142030639 release time:2024-04-18 12:34:53

Fixed loading and unloading bridge: The fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles can move and load goods in batches inside the truck. Only one person can work to achieve rapid loading and unloading of goods. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.

If the elevator malfunctions, non electrical professionals are not allowed to disassemble and assemble electrical appliances at will to prevent accidental connection or electric shock!

Shuangluan.For lifting platforms without manned protection, it is strictly prohibited to carry people during use. At the same time, attention should be paid during use to prevent damage to hands, feet, and clothing.

The current fixed hydraulic elevators are mainly enclosed or meshed lifting channels surrounded by buildings and light steel structures, and use hydraulic cylinders to lift the platform. Its main components are as follows: the lifting passage part: a closed or mesh frame surrounded by buildings or light steel structures, a fixed hydraulic lifting platform with steel guide rails installed on both sides of the internal driving part: it is equipped with hydraulic driving motors,ShuangluanIndustrial hydraulic lifting platform, oil pumps safety valves, fixed hydraulic lifting platform speed control valves The small oil tank cylinder part of hydraulic components such as directional valves: composed of one or more cylinders of a lifting cylinder, a straight top platform, or a lifting shear fork frame forming a door system. The closed or mesh platform door or door system consists of a steel structure, with manual and automatic doors. Generally, open platforms do not have doors. The electrical part is composed of power, signal, safety, lighting, and other devices. The platform part is a steel structure platform that carries heavy objects, There are enclosed (i.e. cabin type) or open types, with guide rollers or guide shoes on both sides. The platform bottom can be connected to the lifting cylinder or lifting scissor type steel frame auxiliary parts, which are composed of hydraulic pipe fittings, pipelines, pressure gauges, and steel structure bases; Safety devices: safety valves limit limits, door electromechanical interlocking, rupture valves, emergency switches, and electrical short circuit protection.

.Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, timely inspection of various functions is essential.

After 5000 hours of operation of the elevator, repair the mechanical and electrical systems.

Website homepage


ShuangluanFixed hydraulic pressure for lifting platformIs there still room for development?



When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs,ShuangluanHydraulic rotary platform, guardrails or safety nets should be installed on the side facing the air, or safety belts or ropes should be used.

Of course, the hydraulic lifting platform uses a dual protection structure, an appropriate working surface can be selected, so that the lifting platform will be safer during operation. The process of operating the hydraulic lifting platform should be standardized, it can also ensure that all technical indicators can meet the design requirements, but it is necessary to connect the ground wire during use. Of course, the hydraulic electrical system does not need to be adjusted in this situation.

Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors,ShuangluanCustomized hydraulic lifting platform, wiring, and oil cylinder once a week to avoid dust and debris affecting normal operation.

quality standard.Small typesetting Copyright Shu ICP Bei No. 11019783-1

Fixed loading and unloading bridge: The fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles can move and load goods in batches inside the truck. Only one person can work to achieve rapid loading and unloading of goods. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.

Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic. Loading and unloading platforms, lifting platforms, and unloading platforms: anti slip devices: This device is welded from steel plates and can effectively achieve anti slip function, which is reliable.


ShuangluanFixed hydraulic pressure for lifting platformIs there still room for development?



Head signature:

where.Regularly check whether the operation of each mechanism is normal and whether there is any noise. If any faults are found, they must be promptly eliminated.

The electric lifting platform needs to work under load according to the regulations on the nameplate during use, it can only briefly overload by 10%.

Hydraulic loading elevators must strictly carry out load-bearing operations in accordance with regulations. Otherwise, it may harm people and objects!

Shuangluan.Maintenance time regulations for hydraulic elevators: After 1500 hours of daily maintenance of the elevator, repair the mechanical and electrical systems.

Regularly check all wires and cables for damage and promptly wrap and replace the damaged parts.

two