MaharapiTemperature measurement of dry-type transformerWhat are the installation skills

announcer:hp122HP117294921 release time:2024-04-18 11:21:27

MaharapiPower plant step-up transformer, the resistance value exceeds 2m ohm bus.

Different diversion methods

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, dry-type transformers mostly use silica gel waterproof casing,MaharapiS11 parameters of oil immersed transformer, while oil transformers mostly use porcelain waterproof casing;

Maharapi.Two point grounding device of iron core caused by residual welding scar;

Difference between dry-type transformer and oil immersed transformer:

.(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.

Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, commerce, airports, tunnel construction, chemical enterprises and factories.


MaharapiTemperature measurement of dry-type transformerWhat are the installation skills



Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

Right, as & ldquo; Great Lars car & rdquo;, After replacing one 255kva small transformer, the utilization rate is close,MaharapiPrice of 200 KVA box type transformer, but the main parameters of the two transformers are evaluated as shown in Table 1. Table 1 evaluates the main parameters of the transformer: capacity (VA) iron loss (W) copper loss (W). Firstly, the output power is saved according to the customary calculation method (ignoring copper loss): the results show that the loss of large capacity transformer is lower than that of small capacity transformer, It actually consumes electromagnetic energy.

Therefore, in the installation process of substation equipment the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

how much.Power transformer

Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly and the harm will not expand to a greater extent.

Noise solution of dry-type transformer


MaharapiTemperature measurement of dry-type transformerWhat are the installation skills



Falling foreign matters and piercing

Installation conditions.When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.

Hand touch method for transformer inspection

If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.

Maharapi.For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, and D (or D) is triangular wiring.