In SalahInspection contents of dry-type transformerWhat are the advantages in the protection industry

announcer:hp122HP117294921 release time:2024-04-17 12:28:26

After 24 hours of continuous trial operation with a certain load, and the transformer will turn to all normal operation.

Dry type transformer

In Salah.Transformer manufacturer

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.

.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light, and it's short when it's heavy. Therefore,In SalahTransformer power supply application, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance,In SalahMain components of box transformer, experts can inspect special tools, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.

The iron core of power transformer is made of high-quality crystallized hot-rolled ferrite core, which is stacked at the 45 degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.


In SalahInspection contents of dry-type transformerWhat are the advantages in the protection industry



Difference between dry-type transformer and oil immersed transformer:

Transformer

Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Encyclopedic knowledge.The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Protective measures for damping of dry-type transformer

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.


In SalahInspection contents of dry-type transformerWhat are the advantages in the protection industry



Sound in case of phase failure

property right.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Principle of step-up dry-type transformer: the step-up dry-type transformer is a component that correspondingly converts low communication AC voltage,In SalahDry type isolation transformer factory, large current flow and small characteristic impedance into high communication AC voltage, small current and large characteristic impedance. When there is an AC circuit in the original coil, the communication AC magnetic flux will be caused in the transformer core (or magnetic core) causing the magnetic induction voltage in the primary coil (or current).

The method and whole process of taking oil sample of power transformer are as follows:

In Salah.& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

Under normal conditions, the actual operation of the oil immersed transformer shall be undertaken by the on-site operation and maintenance management staff. Within one week of grid connected operation, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.