ArawaBox type transformerWhat are the basic requirements for manufacturing

announcer:hp122HP117294921 release time:2024-04-16 12:10:57

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut),ArawaApplication of dry-type transformer, wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, The resistor is generally more than 2000 & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

Arawa.First of all, although dry-type transformer has strong moisture resistance, it is generally open structure or very susceptible to moisture, especially the insulation level of dry-type transformer manufactured in China is low (lower flame retardant grade) Therefore the dry-type transformer can obtain high stability only when the air humidity is below 70%. The dry-type transformer shall also be prevented from stopping operation for a long time to prevent serious damp. When the grounding resistance value is less than 1000 / V (operating voltage),ArawaHigh voltage distribution transformer, it indicates that the transformer is seriously damp, and the trial operation shall be terminated.

The voltage regulating tap changer is not in place or poor

.35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

If the oil immersed transformer is burned by the cover of the transformer, when the oil immersed transformer fails, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.

In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.


ArawaBox type transformerWhat are the basic requirements for manufacturing



Therefore, in the installation process of substation equipment, in the installation and use process of lightning rod, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

The secondary inductive equipment of the distribution station (such as transformer,ArawaDry type transformer Report, voltage transformer, automobile relay, AC, etc.) operates normally. According to the AC current, the winding transformer core will send out a symmetrical rhythm and a certain tone & ldquo; Buzz, buzz & rdquo; Sound. The operation staff of the transformer manufacturer should understand and grasp the characteristics of the noise. When the equipment has common faults, there will be noise and even & ldquo; Crackle & rdquo; The charging and discharging sound can distinguish the generation and characteristics of common equipment faults according to the music law and sound transformation when everything is normal and abnormal.

The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).

Where can I find it?.Some are tied with plastic tape, and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.

Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.

For the leakage that has already occurred, find the leakage point first, which can not be ignored. For the position with serious leakage, shovel or sharp punch can be selected. The leakage point can be riveted with special tools for metal materials. After manipulating the leakage, the treatment surface shall be cleaned and tidy. Polymer composite materials are mostly selected for dry consolidation. After dry consolidation the goal of long-term treatment of leakage can be achieved.


ArawaBox type transformerWhat are the basic requirements for manufacturing



Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

device management.Different diversion methods, dry-type transformers mostly use silica gel waterproof casing, while oil transformers mostly use porcelain waterproof casing;

Relevant responsible persons of the transformer Federation of China Household Appliance Industry Association show that the development prospect of transformers in China in the future is still the development trend of environmental protection, low noise, fire safety and explosion-proof and high reliability. There are two key development prospects: one is the development trend of high voltage and high voltage especially 750kV and 1100kV. The second is the development trend towards environmental protection, energy conservation and miniaturization. The former key is applied to the long-distance substation project route, and the latter key is applied to the substation project route in big cities.

Power transformer

Arawa.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, the human resources traction belt shall be used as a guide.

Oil leakage of bolt or pipe external thread

The voltage regulating tap changer is not in place or poor