Hong KongWorkshop operation elevatorCommon performance analysis

announcer:hp323HP155335083 release time:2024-04-16 10:20:39

The hook of the seat belt should not be hung on unstable or moving objects.

The loading and unloading mobile boarding bridge has become a very common structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and turnover products and goods. The height of the loading and unloading operation platform is fixed,Hong Kong18 meter mobile elevator, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to quickly enter and exit transportation vehicles for loading and unloading operations.

Hong Kong.There are three movable plates on both sides of the adjustment plate, which can effectively avoid accidentally injuring the toes of operators when the adjustment plate is lowered, ensuring the safety of equipment use.

Hydraulic lifting platforms are widely used in factory maintenance, municipal construction, and decoration of hotels in industrial and mining enterprises, with reliable quality and perfect performance.

.The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.

The operation of the single column aluminum alloy elevator is relatively convenient. The gantry is easy to assemble across the frame, with labor-saving operation and flexible movement. It can cross obstacles such as fixed seats with a height of up to 1m, and can operate stably on steps. Made of high-strength rectangular steel pipes with good rigidity and stability. Equipped with universal casters for flexible mobility. The span of the two end brackets can be adjusted, which is suitable for crossing different obstacles. The two end brackets are vertically adjustable and can be used for operations on slopes or steps with a certain slope.

The elevator has a strong load-bearing capacity and is suitable for two people (who can carry a certain amount of weight tools and materials) to climb high at the same time; Various non-standard products can also be customized according to different environments to meet different needs.


Hong KongWorkshop operation elevatorCommon performance analysis



Before connecting the motor to the elevator, the elevator manufacturer should first make the motor shaft keyway perpendicular to the tightening bolt. To ensure uniform force, please first screw on the installation bolts at any diagonal position, but do not tighten them. Then,Hong KongElectric hydraulic elevator 15 meters, tighten the tightening bolts. All tightening bolts require torque wrenches to be fixed and inspected according to the indicated fixed torque data. Elevators and lifting platforms are widely used special equipment for high-altitude operations. Its scissor fork mechanical layout ensures high stability after the elevator is lifted with a wide operating range and high load-bearing capacity, making high-altitude operations increasingly large-scale and supporting multiple people working together. It makes high-altitude operations more powerful and safe. It is a widely used specialized equipment for high-altitude operations.

The concept of hydraulic boarding bridge is the power system of the boarding bridge. The large oil cylinder lifts the entire equipment inclined plate. When it is raised to a large height, the small oil cylinder begins to operate, extending the hinge tongue plate. All equipment plates are made of high-quality high height patterned steel plates and profiles, which are effectively welded and have a long service life.

Emergency bolts not tightened; The solution is to tighten the emergency valve.

Honesty is the foundation.The size of the oil cylinder should be minimized as much as possible while meeting the design requirements. The smaller the size of the oil cylinder, the faster the lifting speed.

High altitude operations involving single person work such as high-altitude cleaning. Products, tens of millions of products for you to choose from, professional elevator manufacturers ensure safe trading

Systems: explosion-proof electronic control system, remote control system, and PIC system. Professional elevator manufacturers have stable, safe, and can achieve maintenance free. Their technical level has reached the domestic level and reached the advanced level of similar international products


Hong KongWorkshop operation elevatorCommon performance analysis



Systems: explosion-proof electronic control system, remote control system, and PIC system. Professional elevator manufacturers have stable, safe, reliable performance, the faster the lifting speed.

Ensure excellent power supply at the installation site, install a separate distribution box, and the electrical leakage switch must meet the requirements for construction elevators when using the distribution box. If the installed construction elevator is variable frequency, the hydraulic oil level should be 40-50 millimeters higher than the bottom of the oil tank. When the color of the hydraulic oil darkens, the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.

Hong Kong.Loose or leaking connection between the oil suction pipe and the gear pump; The solution is to tighten the suction pipe.

What are the installation precautions for elevators? The folding fence and cage of the elevator should be cleaned of the foundation surface, and the foundation bolts should be installed properly. If the construction elevator is installed on the floor a pad iron must be used below the screws to increase the force surface between the nuts and the floor to reduce the impact of the nuts on the floor; Insert steel plate shims of different thicknesses between the chassis and the foundation stone at the anchor bolts to adjust the verticality of the guide rail frame; Install three standard sections and measure the verticality of the guide rail frame using a theodolite to ensure the verticality of each main pipe in both directions. After adjusting the verticality of the guide rail frame,Hong Kong10 meter self-propelled elevator, tighten the four foundation bolts; Adjust the verticality of the fence door frame as above and tighten the remaining anchor bolts; Install the buffer spring; Connect the other half of the fence to the front half with bolts; Adjust the verticality and tighten the anchor bolts as above, and release the brake on the motor inside the suspension cage. (For SC200/200 models, first install the suspension cage before installing the drive plate).

The current should exceed the rated current, and even cause the motor to stop on its own. If the shutdown time is slightly longer and the power supply is not cut off, the winding will not only overheat severely, but also burn out. When a star connected motor is mistakenly connected into a triangle, or a motor with multiple coil groups connected in series into a branch is mistakenly connected into two parallel branches, it will cause the winding and iron core to overheat, and in severe cases, the winding will be burned out.