DelanceyMobile hydraulic loading and unloading boarding bridgeThe function of the protective device

announcer:hp161HP196399230 release time:2024-04-15 12:13:42

The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

Monthly maintenance of hydraulic boarding bridges: check for wear on rollers, intermediate shafts and bearings, boom hinge shafts and bearings, etc; The oil quality and level of hydraulic oil; The hydraulic boarding bridge should be raised throughout the entire process, and at this position, the hydraulic surface should be 40 to 50 millimeters higher than the bottom of the box. The hydraulic oil is darkened, sticky, or has foreign objects such as gravel. If found, it should be replaced in a timely manner; Add some oil to each part to extend the service life of the bearing. The hydraulic boarding bridge has a wide range of uses. Doing the above points well not only ensures your personal safety but also extends the service life of the equipment, making the boarding bridge better serve you.

Delancey.Keep the hydraulic boarding bridge system clean: regularly replace the oil and filter. Good hydraulic oil contains various additives that can prevent oil deterioration or blockage of system components. However, these additives will lose their effectiveness after a period of time. Therefore, the oil should be replaced regularly to ensure that the additives are effective. The filter can only absorb a limited number of dirt particles and other impurities from the oil. Replace the filter according to the recommended cycle to keep the system clean.

The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.

.The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, I believe


DelanceyMobile hydraulic loading and unloading boarding bridgeThe function of the protective device



The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

When it comes to fixed hydraulic boarding bridges, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel, so that they can handle faults in a short period of time.

Please check if the power supply is stable and if there is a disconnection in the circuit. If everything is checked to be normal, it should be considered whether there is built-in power

As an important part of the boarding bridge,DelanceyFixed boarding bridge, the height can be adjusted according to the different vehicles of the goods, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

supply.What is a hydraulic boarding axle? The hydraulic boarding bridge is a special auxiliary equipment used for fast loading and unloading of goods and its height adjustment function can build a bridge between the truck and the warehouse platform. What are the operational steps we take during use?

Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!

The safety valve of the mobile hydraulic boarding bridge can also generate high noise. When air is mixed into hydraulic oil,DelanceyHuangshi boarding bridge, the relief valve gets stuck or severely worn, and the fatigue deformation of the relief valve spring leads to unstable pressure regulation of the relief valve. The pressure release time of the relief valve is too short, which can easily lead to local stability of the pilot valve performance of the relief valve. Noise is generated by the vibration of the pilot valve's air. Therefore, we should regularly clean the safety valve, and replace it if it is damaged or severely worn.


DelanceyMobile hydraulic loading and unloading boarding bridgeThe function of the protective device



There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.

How many?.The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Keep the hydraulic boarding bridge system clean: regularly replace the oil and filter. Good hydraulic oil contains various additives that can prevent oil deterioration or blockage of system components. However, these additives will lose their effectiveness after a period of time. Therefore, the oil should be replaced regularly to ensure that the additives are effective. The filter can only absorb a limited number of dirt particles and other impurities from the oil. Replace the filter according to the recommended cycle to keep the system clean.

These are the options for hydraulic oil for mobile boarding bridges.

Delancey.Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate,DelanceyMobile boarding bridge brand, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

Common&quo; Work” Steel structure planning can withstand uniform pressure, reduce skeleton torque, and be more robust than other channel structures.