Oil immersed transformer

Note: in the whole process of safety patrol inspection the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself,Saada16 kV Transformer, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

Saada.Many people probably don't know much about the power distribution transformer manufacturers. In fact, the transformer can be plugged in for trial operation after careful inspection before capital investment. During the trial operation period, noise and vibration, whether there is abnormal smell such as coke smell, and whether there is discoloration caused by partial overheating. Ventilation is good. In addition,SaadaOil immersed transformer 1250,SaadaCapacity specification of power transformer, we should also pay attention to the following aspects.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

.Dry type transformer

If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear 4 round steel from top to bottom in the surrounding screw holes and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for 100mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.

Power transformer manufacturer


SaadaWarranty period of oil immersed transformerChemical composition and its characteristics



The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

Transformer inspection ear

If the above provisions are not met, the problem of dryness shall be solved. Generally, it is OK to operate the centrifugal fan for a period of time. Check the cleanliness of the power transformer. If too much dust is found, it must be eliminated to ensure indoor ventilation and avoid insulation penetration. In particular, pay attention to cleaning the insulators of the power transformer and the top and bottom ends of winding resistance installation. Portable centrifugal fan or dry air compression or N2 shall be used to clean the dust in indoor space that is not easy to reach, such as ventilation duct, and there shall be no dirt.

Excellent service.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

35kV and above & plusmn; No load of rated voltage; Part of the circuit breaker of the tap power switch is installed in the phenolic resin insulating paper cylinder, and the insulating paper cylinder is installed on the wooden frame. The actual operation rocker is connected with the dynamic circuit breaker of the tap power switch according to the wooden insulating rod. The on load tap off power switch is insulated from the ground by the insulating paper cylinder of the power switch itself and the insulating limit.

(III) dry type transformers of 315KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than 5m; The distance between the electrified part and the road surface shall not be less than 5m.


SaadaWarranty period of oil immersed transformerChemical composition and its characteristics



The switching power supply lacks one phase of power;

equipment maintenance .Operation of oil immersed transformer

Power transformer is indispensable for power stations and substations, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Oil leakage of bolt or pipe external thread