WarsawUsed electric elevator platformWhat is the current role

announcer:hp935HP175192871 release time:2024-04-13 09:52:10

The counterweight guide rail should meet the specification requirements.

Then, the lifting platform platform platform that carries the load needs to be balanced, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.

Warsaw.Attention should be paid to the occurrence of oil leakage on the aluminum alloy lifting platform to avoid secondary damage caused by a shortage of hydraulic oil. Overloading work is prohibited during use

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

.To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front, back, left, and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, so that the entire platform does not have a height difference, the rotary valve will automatically open. To close the plug valve,WarsawSmall electric mobile elevator, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.


WarsawUsed electric elevator platformWhat is the current role



Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

In addition, when adding hydraulic oil, it is necessary to ensure the quality of the hydraulic oil, as some hydraulic oil manufacturers will choose hydraulic oil with poor quality. Hydraulic oil such as hydraulic lifting platforms not only cannot have any effect on folding arm elevators, but also affects the working efficiency of folding arm electric elevators due to deterioration issues.

The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Honesty and mutual benefit.The safety bulletin board for construction electric elevators should be hung at the protective shed of the electric elevator,WarsawSmall electric pulley elevator, with a size of 8 meters by 2 meters.

Flat screw mechanical electric lifting mechanism: The lifting platform of this structure has the advantages of small civil engineering coordination, shallow foundation pit required, large stroke, stable operation, low noise, accurate positioning, and low cost. Adopting a horizontal screw drive and a scissor fork structure to achieve the lifting motion of the table it can be stopped arbitrarily within the range of travel.

Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform, which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, etc.


WarsawUsed electric elevator platformWhat is the current role



The bearing capacity of the ground under the concrete foundation plate should be greater than 0.15Mpa.

total cost.When the wall bracket cannot meet the requirements of the construction site it should be designed and calculated separately.

Is there a relevant rule requirement for the cleanliness of hydraulic stations?

The foundation production and acceptance of electric elevators for foundation construction should comply with the user manual and regulatory requirements.

Warsaw.Secondly, the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level, timely inspection of various functions is essential.

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).

Model Example: Hanging Cage Specification: LABSC200/200TD3200x1500 Type I: 2900~3600 Type II: 2900~3600 Type V: 1800~250044003800 Technical Requirements: The load-bearing capacity of the foundation should be greater than P: P=(hanging cage weight+outer cage weight+total weight of guide rail frame+counterweight+load) x0.02 (kN).