San AntonioHydraulic fixed boarding bridgeWhat is the factory way

announcer:hp161HP196399230 release time:2024-04-13 09:11:09

These are the options for hydraulic oil for mobile boarding bridges.

During construction, the factors of loading and unloading operations were not taken into account. The platform type loading and unloading bridge serves as a remedial solution and can also meet the requirements for loading and unloading operations into truck carriages. The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms. Is the boarding bridge easy to use? The boarding bridge is an auxiliary equipment used to bridge with the freight car and is designed to solve the height difference between the freight car and the ground. Suitable for fixed or mobile loading and unloading of goods, it is actually equivalent to a slope,San AntonioHydraulic fixed boarding axle, allowing forklifts to smoothly enter the carriage to load and unload goods, requiring only one person to quickly load and unload goods, which is labor-saving.

San Antonio.Fixed loading and unloading bridge: The fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles can move and load goods in batches inside the truck. Only one person can work to achieve rapid loading and unloading of goods. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.

Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

.Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, try to eliminate it; If there is electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Slowly reverse and park the container under the lip at the front of the boarding bridge.

As an important part of the boarding bridge, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).


San AntonioHydraulic fixed boarding bridgeWhat is the factory way



There is a flip plate at the top of the bridge deck, convenient operation, safety and reliability beautiful appearance, making it a high-altitude work equipment with better safety and work efficiency.

The slope of the electric hydraulic boarding bridge itself must have a certain slope to allow the forklift to enter the carriage for cargo loading and unloading. The length of the slope also varies from 7000mm to 7500mm,San AntonioAxle Co., Ltd,San AntonioFixed hydraulic boarding bridge, the manufacturer of the boarding axle has no turnover to avoid the price difference, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

Open the manual valve, slowly lower the boarding bridge and secure more than 90% of the lip plates at the bottom of the container.

Open planning before placement makes it easy to clean up clutter.


San AntonioHydraulic fixed boarding bridgeWhat is the factory way



When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.

quality standard.The platform side boarding bridge is directly installed at the front edge of the loading and unloading platform. There is no need to excavate or reserve pits on the loading and unloading operation platform, and there is basically no change to the building structure.

(4) For the connection parts of the mobile boarding bridge, careful inspection should be carried out to check for any looseness, such as connecting bolts. If there are any they should be tightened in a timely manner. In addition, for all connecting shafts, there should be split pins that are thick and sufficient.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

San Antonio.Check if the manual valve is open. When using, it must be opened, otherwise the boarding bridge may be damaged.

The reason for the natural descent of the hydraulic boarding bridge lifting platform is that the one-way valve is leaking, the lowering valve is not tightly sealed, and the oil cylinder is leaking. Solution: Check the one-way valve in the valve group. If dirt is found on the sealing surface of a single valve, clean the one-way valve. Check if the lowering valve has power. If there is power, troubleshoot the lowering valve itself or replace the lowering valve. The slide valve of the lowering valve must be kept clean and move flexibly.

The user department of the hydraulic boarding bridge should scientifically analyze the equipment and reasonably determine the investment in the equipment. At the same time, according to the characteristics of the work, professional personnel should be arranged to carry out on-site maintenance and upkeep to ensure that the lifting platform truck is always in normal operation, ensuring timely loading and unloading of supplied materials; The normal operation of equipment needs to be guaranteed by institutional measures, improve relevant management systems, strengthen dynamic management of equipment faults, monitor the status of key parts, and analyze the patterns of faults through maintenance; It is necessary to ensure the supply of maintenance accessories, establish a spare parts warehouse for vulnerable and commonly used parts, and purchase channels to avoid situations where inadequate preparation may lead to extended downtime and increased repair costs; Users should maintain a close relationship with survival manufacturers, strengthen the professional quality and professionalism of lifting platform maintenance personnel so that they can handle faults in a short period of time.