Ratpi houseKs11 mining power transformerLand area

announcer:hp122HP117294921 release time:2024-04-11 11:29:23

Power transformer factory

Seal oil leakage

Ratpi house.Transformer

Power transformer factory

.The voltage regulating tap changer is not in place or poor

Dry type transformer company

Power transformer is an idealized supporting facility transformer for medium cabinet and high-voltage cabinet at the present stage, and can be equipped with safety protective casing according to different waterproof grades. It is applicable to key or unique natural environment sites such as multi-storey buildings, airports, tunnel construction, chemical enterprises and factories.


Ratpi houseKs11 mining power transformerLand area



Oil leakage of cast iron parts

For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition, the oil with the same basic,Ratpi house630 dry type transformer manufacturer,Ratpi houseWhat are the protections for oil immersed transformers, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than 5%, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain if there is more new remaining oil, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.

After 24 hours of continuous trial operation with a certain load,Ratpi houseModel of oil immersed transformer, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

Variable cost.The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

Difference between dry-type transformer and oil immersed transformer:


Ratpi houseKs11 mining power transformerLand area



Seal oil leakage

quality standard.After tightening the loose bolts seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

The insulation between silicon steel sheets is damaged, resulting in overheating and melting of the iron core;

Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

Ratpi house.Manufacturing process and steps of dry-type transformer

Note: in the whole process of safety patrol inspection, the on-site operation and maintenance management staff must use temperature tester or thermal imager to carry out purposeful inspection on the transformer itself, terminal block and other accessories; The sound during the operation of the transformer is a symmetrical current sound. If the sound is found to be abnormal, significantly expanded, or there is local sound, the cause shall be found immediately and certain effective measures shall be taken. If necessary, the load can be reduced or the operation of the transformer can be stopped.

In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.