Mandy bahadinHigh frequency power transformerCarrier volatility

announcer:hp122HP117294921 release time:2024-04-06 10:29:47

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance,Mandy bahadinBrand of oil immersed transformer, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.

Mandy bahadin.The rate of transformer is: n = P2 / p1x1o%, that is when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore, the load of transformer is: 0 = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, Generally it is about 50%, but when selecting the transformer capacity, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.

The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

.Oil leakage of heat pipe radiator

In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg, and the oil sample for simplified experiment shall not be less than 1kg.

The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:


Mandy bahadinHigh frequency power transformerCarrier volatility



The scientific research of power transformer oil is generally carried out according to the way of sampling. What are the common sampling methods and processes?

Transformer manufacturers generally adopt IP20 protective casing, which can avoid the entry of solid dirt with a diameter of more than 12mm, rats, cats, birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP23 protective casing can be adopted, which can avoid being equally divided with the above IP20 protective effects However, IP23 casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the grounding resistance between the terminal and the ground wire. When accurately measured by 1000V megger, the resistance value exceeds 2m ohm bus.

Service first.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

It is generally made due to unreasonable installation or ineffective sealing. Polymer composite materials can bond metal materials,Mandy bahadinScb13 dry type transformer with secondary energy efficiency,Mandy bahadinRanking of box transformer manufacturers, porcelain, laminated glass and other materials very well, so as to achieve the pressure management of oil leakage.

The whole process of hanging the core of dry-type transformer is more critical, and there are many situations that the hanging core of dry-type transformer must pay special attention to. Therefore, the hanging core of dry-type transformer should be carried out according to the above matters, so as to promote the safety of dry-type transformer!


Mandy bahadinHigh frequency power transformerCarrier volatility



Turn off the gate valve (butterfly valve) of the left and right tablet computers of the heat pipe radiator to isolate the oil in the heat pipe radiator from the oil in the tank, so as to reduce the working pressure and leakage. After the leakage location is determined, appropriate surface treatment shall be carried out, and then Fushi blue raw materials shall be selected for sealing treatment.

market.Oil leakage at looper flange

When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test, and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.

The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.

Mandy bahadin.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

Falling foreign matters and piercing

It includes the performance and main uses of insulating layer materials, various insulating layer parts, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard production process and quality standard of electromagnetic shielding.