Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).

Silmhantan.Setting requirements: Buffers should be installed below the suspension cage and counterweight running channel.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance,Silmhantan10 meter self-propelled elevator, the protective measures taken should comply with the specification requirements.

.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator,SilmhantanElectric screw elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form and concrete strength report.


SilmhantanElectric elevator factoryAssembly scheme



When the door is closed, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts, as well as the gap around the door or the gap between parts should comply with the provisions of Table 4 of GB 23821-2009.

Setting requirements: Construction electric elevators should be equipped with up travel (limit) switches.

According to the needs of different performance genres, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, an extended stage, an island stage, an intermediate stage, a T-shaped stage,SilmhantanMobile electric hydraulic elevator, or a hall.

resources.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the verticality deviation of the guide rail frame should not exceed (5/1000) h.

The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.

Setting requirements: Each landing entrance should be equipped with a landing door, which should cover the opening with its full width, and should not open towards the lifting passage.


SilmhantanElectric elevator factoryAssembly scheme



Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

ranking.The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.

Pole

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

Silmhantan.Installation verticality deviation guide rail frame erection height, h/mH≤ 7070100150H& gt; 200 verticality deviation/mm≤ (1/100h≤ 70≤ 90≤ 110≤ 130 pairs of steel wire rope construction electric elevators, the form of the stage can be changed. For example, using an orchestra pit lift can combine a framed stage with a large lip or even an extended stage. In an experimental theater, using a lift can make the theater have various forms such as an end stage, an extended stage, an island stage, an intermediate stage, a T-shaped stage, or a hall.

When applying a normal force of 300N to any position on either side of the door using a rigid 5000mm2 square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding 30mm; After the test, it worked normally.