Nuremberg 3 meter high electric elevatorInstallation guide

announcer:hp935HP175192871 release time:2024-04-03 09:03:26

Nuremberg Small electric hydraulic elevator,

Especially suitable for steel structured factories suitable for both indoor and outdoor installation.

When the wall bracket adopts non matching standard products, design calculations should be carried out.

Nuremberg .Aluminum alloy lifting platforms can be divided into single column aluminum alloy, cargo elevator, double column aluminum alloy, automated warehouses, parking lots, docks, buildings, except for the gap between the lower part of the door that should not exceed 35mm, any through-hole and opening size related to the distance between any door and adjacent moving parts,Nuremberg Electric three wheel elevator, as well as the gap around the door or the gap between parts, should comply with the provisions of Table 4 of GB 23821-2009.

.The scaffolding of the parking platform should be laid tightly and firmly.

It is understood that the scissor type lifting platform is a widely used specialized equipment for high-altitude operations. Its shear fork mechanical structure provides high stability for the lifting platform, and high load-bearing capacity, making the range of high-altitude operations larger and suitable for multiple people working simultaneously. The lifting power is divided into 24V, 220V or 380V power supplies, diesel engines, using Italian and domestic hydraulic pump stations, and the table top is equipped with anti slip insulation buckle plates, which have anti slip, insulation, and safety features. Please rest assured to use.

Steel wire ropes, pulleys, and counterweight steel wire ropes shall comply with the following regulations: the characteristics of steel wire ropes shall comply with the requirements of General Purpose Steel Wire Ropes GB/T20118; Maintenance, wear, deformation, and corrosion of steel wire ropes


Nuremberg 3 meter high electric elevatorInstallation guide



During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.

Savings, rate of increase and decrease. To ensure safe and reliable braking and prevent accidents, a hydraulic control one-way valve, also known as a hydraulic lock, is added to prevent hydraulic pipelines from exploding and self locking safely. Installed overloaded voice control alarm

Secondly, for the replacement of hydraulic oil on the lifting platform it is recommended to replace it every three months. If the frequency of use is not high, and after changing the hydraulic oil it can be replaced once a year. The hydraulic oil must be clean, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

Quality Assurance.Setting requirements: For construction electric elevators with foundations installed on roof slabs, floors,Nuremberg Folding electric elevator, or other lower suspended structures, the bearing capacity of the foundation support structure should be checked. Click here to download the construction technical information for free. Basic drainage facilities should be installed.

News Abstract: The development of the lifting platform industry will continue to grow in recent years! With the continuous development of electric lifting machinery for high-altitude operations in recent years, the products of electric lifting platform vehicles have been continuously improved, and various new technologies and materials have emerged, making the further development of lifting platform vehicles possible.

From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery


Nuremberg 3 meter high electric elevatorInstallation guide



Setting requirements: Drainage measures should be set up for the foundation of construction electric elevators to ensure smooth drainage.

For more, please check.Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

The magnetic directional valve returns to the fuel tank. To ensure stable landing of heavy objects and safe and reliable braking, a balance valve is installed on the return oil circuit to balance the circuit and maintain pressure, so that the landing speed does not change due to heavy objects. It is adjusted by the saving valve

Setting requirements: The verticality deviation of the installation of the guide rail frame of the construction electric elevator should comply with the requirements of the user manual and specifications, as specified in the above table.

Nuremberg .Double layer steel mesh: The diameter of the steel bars is 12mm, with a spacing of 200mm.

High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.

Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.