The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.

When the horizontal distance between the edge of the cage and the edge of the landing or between the cage and the landing door is greater than 150mm and there is no effective protection from other structures, the side protection device for the landing entrance should be equipped.

Zhejiang.Precautions for safe use of electric elevators: Before use, remove any obstacles or debris near the electric elevator that may hinder operation, and check whether the operating handle can be used normally.

Setting requirements: Before starting work every day and changing shifts the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results,ZhejiangElevator electric 6 meters, and report any problems found to the user unit.

.Before installation, foundation bearing capacity embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.

From the perspective of the safety performance of the machinery itself, those that have undergone national safety certification will not have significant safety issues. The main problem is that after using the electric elevator for a period of time, mechanical components may fall off or be damaged due to various factors. This problem depends on regular inspection and maintenance of the machinery

Setting requirements: The installation and dismantling workers, electricians and other operators of construction electric elevators should have special construction operations.


ZhejiangElectric light liftDoes it have any effect on practicality?



The verticality of the guide rail frame should meet the requirements of the specifications.

Is the water cooling and air cooling of the hydraulic station the same?

Setting requirements: For construction electric elevators that operate in multiple shifts, the handover system should be implemented, and drivers should fill out the handover record form according to the standard requirements. The driver should conduct a pre shift inspection and confirm that there are no errors before starting the machine for operation.

Word of mouth recommendation.The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered 2 to 3 times to ensure that the air in the oil cylinder is completely discharged,ZhejiangDedicated electric elevator, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.

The landing door should be in a normally closed state. Without the permission of the construction electric elevator driver, the landing door shall not be opened.


ZhejiangElectric light liftDoes it have any effect on practicality?



The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Product survey.As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, civil engineering, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load, can achieve multiple points, and can be controlled up and down floors to achieve safe use.

The downward movement of the hydraulic cylinder (i.e. heavy object lowering). The hydraulic oil enters the upper end of the hydraulic cylinder through the explosion-proof electromagnetic directional valve, and the return oil from the lower end of the hydraulic cylinder passes through the balance valve, energy-saving valve, and explosion-proof electric valve

The list of materials for making landing doors is as follows: Table 1: List of materials for making landing doors. Landing doors should be installed at the entrance of each landing station, and the landing doors should function properly.

Zhejiang.Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be 40-50 millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner (32 # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform, blow out the plunger with compressed air,ZhejiangMobile electric elevator, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint, remove the oil filter, clean it with compressed air, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.