AIX ProvenceSelf propelled electric elevatorLow-noise selection skills

announcer:hp935HP175192871 release time:2024-03-31 11:01:22

To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea, using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

For customers to use and operate the lifting platform for a long time, the editor briefly introduces how to maintain and repair the lifting platform: First of all, normal maintenance is mainly focused on prevention, especially if any damage or malfunction is detected and corrected or repaired in a timely manner. Careful inspection and maintenance at this time can save costs and avoid larger problems, resulting in costly repairs.

AIX Provence.High altitude operations and maintenance in areas such as repair, electricity, transportation, petroleum, chemical, sports center, mining, and enterprise. The lifting system of the lifting platform is driven by hydraulic pressure, also known as hydraulic lifting

The entrance of each landing platform must be equipped with a landing door, which must open towards the landing platform side, and the door bolt must be set on the side next to the construction electric elevator.

.The oil cylinder and sealing components are made of imported components to solve the problem of unstable oil pressure and oil leakage of components for customers.

Setting requirements: The quality of the standard section should meet the requirements of the product manual. Before installing the construction electric elevator, all components should be inspected, and standard sections and other components with severe wear and deformation should be replaced.

During normal operation the horizontal distance between the closed cage door and the closed landing door should not exceed 150mm. Otherwise, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.


AIX ProvenceSelf propelled electric elevatorLow-noise selection skills



Emergency manual valve: In case of power failure,AIX ProvenceSmall electric automatic elevator, it can cause the car to descend to the nearest floor position and open the door

Unloading platform and attached electric construction platform, etc.

The use of standard section connecting bolts should comply with the user manual and specification requirements.

Manufacturing cost.Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.

Low power consumption: When the hydraulic guide rail lifting platform descends, it is driven by the pressure generated by its own weight, greatly saving energy and reducing consumption.

As a material loading and unloading equipment recognized by customers in the lifting platform, the guide rail hydraulic lifting platform is superior in terms of product, and operating costs. The editor of the electric elevator will provide a detailed analysis: the advantages of the product are that the equipment bears a large load can achieve multiple points, and can be controlled up and down floors to achieve safe use.


AIX ProvenceSelf propelled electric elevatorLow-noise selection skills



The hydraulic oil forms a certain pressure by the vane pump,AIX ProvenceElectric elevator 200kg, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).

analysis.The spacing between wall brackets and the height of guide rails above the high attachment point should comply with the requirements of the user manual.

Only after the operation of professional personnel can the suspension cage movement be restored.

Setting requirements: The foundation and foundation of the construction electric elevator should meet the requirements of the user manual. Before installing the construction electric elevator, the foundation should be inspected and accepted according to the requirements of the specifications. Only after passing the inspection can the installation be carried out.

AIX Provence.Human improper operation is the main factor causing malfunctions in scissor type electric elevators. When stacking goods, electric elevators should stack the goods neatly, which is better than stacking them in the center of the cargo stacking area of the cargo elevator to avoid imbalance between the two ends of the stacking area. Eventually, during the operation of the electric elevator, it may cause the electric elevator to lose balance. After the goods are stacked completely, ropes should be used to lock the goods, so that they are not afraid of the goods during the lifting process; Careless; Scattered down

Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.

When the foundation is set on the roof or floor structure, the bearing capacity of its supporting structure should be checked.