Raj ShahiHow much is a 250kVA box transformerWhat should I pay attention to when installing

announcer:hp122HP117294921 release time:2024-03-23 13:51:21

The method and whole process of taking oil sample of power transformer are as follows:

Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management which can control the oscillation below 0.2%, the ratio of output power to input power of transformer is called the efficiency of transformer, i.e. & ETA; Is the efficiency of the transformer; P1 is the input power and P2 is the output power.

The voltage regulating tap changer is not in place or poor

.Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.

Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.

Oil leakage of cast iron parts


Raj ShahiHow much is a 250kVA box transformerWhat should I pay attention to when installing



What is the reason for the shutdown of power transformer?

The transformer manufacturer shall not use hand touch method to detect energized high-voltage equipment, such as transformer in operation and neutral grounding equipment of arc suppression coil. For the equipment without power supply and whose shell is reliable grounding device, the temperature or temperature rise must be tested by hand. The secondary equipment can be inspected by hand touch method when it is hot and vibrated.

Power transformer manufacturer

Where can I find it?.Oil leakage at electric welding position

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ 4Ω,Raj ShahiSubstation transformer, The resistor is generally more than 2000 & omega;, According to Ohm's law, the current is only 1 / 500 of the total current flow, so as to play a guarantee effect. The higher the voltage,Raj ShahiStandard for transformation ratio of power transformer, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.

In the electric field of the winding to the yoke there must be a strong line breaking component, so that sliding flash charge and discharge may occur at a lower current. In order to better solve this disadvantage, the appearance of the insulating parts between the winding and the iron yoke should be the same as that of the medium horizontal plane of the winding to the iron yoke insulation as far as possible, so as to reduce the electric field component intersecting with the insulating parts.


Raj ShahiHow much is a 250kVA box transformerWhat should I pay attention to when installing



Falling foreign matters and piercing

Development Curriculum.In the case of dry-type transformer operation, there is more noise, and some even cause noise, which seriously endangers everyone's no problem rest time and work. At this time, the dry-type transformer needs sound insulation treatment. There are many processes and key methods to deal with the noise of the common dry-type transformer. How should the noise of the dry-type transformer be solved? Or with the dry-type transformer manufacturer's network editor to simply understand it.

Under normal conditions, different oil-based oils cannot be mixed. Under special circumstances,Raj ShahiPower transformer insulation, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.

Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.

Raj Shahi.Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.

Protective measures for damping of dry-type transformer

What is the wiring mode of dry-type transformer?