San Antonio AltosTransformer power supplySkills for choosing homework methods

announcer:hp122HP117294921 release time:2024-03-21 13:05:08

On load commissioning:

Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, check whether the equipment has abnormal sound, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.

San Antonio Altos.At that time, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

Oil immersed transformer operation

.In specific daily life,San Antonio AltosS13-630 power transformer, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?

Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

Insulation and heat removal are different. Dry type transformers are generally insulated with epoxy resin, cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulated by insulating oil, insulated by insulating oil in the circulating system inside the transformer, and heat is discharged on the radiator (radiator) of the circulating system inside the transformer.


San Antonio AltosTransformer power supplySkills for choosing homework methods



(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

Hand touch method for transformer inspection

The power transformer belongs to relatively durable electrical equipment, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below:

Promotion.(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

(II) the height width ratio of dry-type transformer pier installed on the ground is generally 0.5m, and a guardrail of no less than 7m shall be installed around it,San Antonio AltosPower transformer, and a warning sign shall be hung at a prominent position.

Loose core screw


San Antonio AltosTransformer power supplySkills for choosing homework methods



Power transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.

Welcome calls .Therefore,San Antonio AltosPower transformer customization, it is necessary to find the short-circuit fault point according to the fault situation lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, and the harm will not expand to a greater extent.

How is the quality level of dry-type transformer compared with foreign countries?

Sound in case of phase failure

San Antonio Altos.Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.

Noise pollution control and prevention measures of dry-type transformer

Manufacturing process and steps of dry-type transformer