LanceElectric fork lift tableStrong growth in export orders

announcer:hp935HP175192871 release time:2024-03-21 10:02:13

The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.

The quality of the standard section should comply with the product manual and specification requirements.

Lance..

Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement

.Pipeline rupture valve: When the hydraulic system pipeline ruptures and the car stalls and descends, it can automatically cut off the oil circuit and stop descent

When the wall bracket cannot meet the requirements of the construction site, it should be designed and calculated separately.

Setting requirements: When the distance between the outer edge of the construction electric elevator and the external overhead power line cannot meet the requirements of a small safety distance the protective measures taken should comply with the specification requirements.


LanceElectric fork lift tableStrong growth in export orders



During normal operation, measures should be taken to make it meet the requirements, or side protection devices at the entrance of the landing station that meet the requirements should be equipped. The distance between any opening between the side protection device and the hanging cage or landing door should not exceed 150mm.

The water cooling of hydraulic stations is generally tubular water cooling. The selection is based on the heat load to calculate the heat exchange area,LanceElectric scissor lift, while the air-cooled electric elevator uses an air cooler to calculate the heat exchange capacity based on the heat load. Then, the selection calculation is carried out under the condition of satisfying the flow rate. So, these two types of cooling are different and have significant differences.

Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.

Direct labor.To meet the needs of choreographers and choreographers in different plays, different heights of the lifting platform can be used to change the shape of the stage according to the requirements of the choreographers and choreographers, in order to adapt to the requirements of the plot for the scenery or venue, and save manpower and material resources for setting up. By using the tilting device of the lifting platform to form a tilted platform, a better highlighting effect can be achieved in various performances. According to the needs of the plot, special atmosphere and effects can be created. Even simple stage machinery often participates in performance activities, creating unexpected atmosphere and effects according to the needs of the plot. For example, using the low-speed descent of the lifting platform to represent a sunken ship in the sea using the valves on the lifting platform and the sudden disappearance and appearance of actors on the lifting platform.

Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.

Drainage measures need to be considered around the foundation. (Drain the accumulated water on the foundation).


LanceElectric fork lift tableStrong growth in export orders



Principle of electric elevator rotary valve: When the electric elevator rises, the rotary valve will automatically open. To close the plug valve, it is necessary to first turn the handle to turn the plug to a 90 degree position until it is closed, and then turn the transmission handwheel to lower the plug and achieve sealing.

Administration.The setting of the cable guide frame should comply with the user manual and regulatory requirements.

Platform.

Civil engineering advantages: The pit depth of the guide rail type lifting platform is generally around 150-300mm,LanceElectric wire rope elevator,Lance24 volt electric elevator, and the landing doors should function properly.

Small safe operation distance: Circuit voltage (kV) of external power lines<11~1035~110220330~550 Small safe operation distance (m) 4681015 Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.

Setting requirements: The installation and dismantling workers, electricians, and other operators of construction electric elevators should have special construction operations.