warnes Structure of 35 kV oil immersed transformerHow much do you know about the 11 characteristics of

announcer:hp122HP117294921 release time:2024-03-15 14:16:07

wipe the Fushi blue film remover on the surface bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut)

After sampling, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.

warnes .The appropriate power saving calculation formula should be derived from the following process: active power loss of large capacity transformer: load of large capacity transformer; PDK - short-circuit fault loss of large capacity transformer, kW. Active power loss of small capacity transformer: when a pump room is in normal operation, and each pump is driven by 100kW motor, so the usual load is 200 KW, CST = 0. One 750kva transformer was originally configured, and the capacity utilization rate introduced by the transformer manufacturer is only 34%

Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.

.The main reason is that the welding quality of electric welding is poor, there are empty welding, open welding, needle holes, sand holes and other shortcomings in welding. The oil transformer is easy to be covered with welding powder and paint when leaving the factory, and the potential safety hazards are exposed after operation. In addition, the electromagnetic induction vibration will crack the electric welding and lead to leakage.

Operation and maintenance management of oil immersed transformer

When sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.


warnes Structure of 35 kV oil immersed transformerHow much do you know about the 11 characteristics of



Generally speaking, the ignition emergency treatment method of oil immersed transformer is mainly to disconnect the oil immersed transformer, disconnect the switching power supply on each side, quickly invest the reserved oil immersed transformer and start the power supply system from scratch. Stop the operation of refrigeration equipment. Key oil immersed transformer ignition. When L-type oil immersed transformer and high voltage station oil immersed transformer are ignited, the generator set must be disassembled first.

How is the quality level of dry-type transformer compared with foreign countries?

The capacity and working voltage are different. The dry-type transformer is generally suitable for distribution equipment. The capacity is generally below 2000kVA and the working voltage is below 35KV, which also ensures the rated voltage of 110kV; Oil immersed transformers are generally suitable for distribution equipment.

The cost is reasonable.On load commissioning:

For no-load impulse closing of transformer pay attention to the following matters:

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.


warnes Structure of 35 kV oil immersed transformerHow much do you know about the 11 characteristics of



Deterioration damage of transformer core insulation

Production department.The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance,warnes Loss standard of dry type transformer, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.

Power saving analysis of transformer

The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety,warnes 10kV dry type test transformer, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit,warnes List of loss standards for dry-type transformer, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

warnes .The time difference between different steps of three-phase power switch of switching power supply shall be less than 10ms, the closing shall be maintained by high-voltage arrester, connect the data signal contact of the automobile relay with the alarm circuit, the pull-in contact with the opening circuit, and we can't neglect it in daily application. The common problems of power transformer conductor, power transformer winding and power transformer tapping power switch are analyzed below: