West BromwichPower station transformerThe specifications are very strict

announcer:hp122HP117294921 release time:2024-03-14 09:19:19

The voltage regulating tap changer is not in place or poor

(IV) the transformer on the column shall be stable and firm, and the waist rail shall be & phi; 0mm galvanized wire shall be wound over 4 turns in an even number. The iron wire shall not have a connector and shall be tightened after winding. The distance between the waist rail and the energized part shall not be less than 0.2m.

West Bromwich.It can be seen from the above that from the perspective of power saving, in some cases, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, Even less than & ldquo; Great Lars, little dragons & rdquo; Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: 3. The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer 1. Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P, the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.

When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about 2kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.

.The oil in the machinery and equipment of the oil storage tank shall generally stand for more than 8h before sampling; it is not necessary to stand when sampling on the running power transformer.

On load commissioning:

The power transformer is designed according to the temperature protection scheme. The embedded parts in the material layer of high (low) pressure electromagnetic coil poured with integral concrete are provided with longitudinal ventilation duct which can be equipped with air-cooled machinery and equipment (cooling centrifugal fan). After selecting air-cooled machinery and equipment, the output capacity can be increased by 20%.


West BromwichPower station transformerThe specifications are very strict



The input and output three-phase power lines shall be connected to phase a, phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.

This is the example of power consumption engineering as power saving. The key reason is that the habitual calculation method ignores the copper loss.

Difference between dry-type transformer and oil immersed transformer:

Market trend.Power transformer plant

For 630kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.

The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of 0.5kg or 1kg. 2-3 bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source,West BromwichImpulse test of dry-type transformer, sampling date, weather conditions and other materials of the oil sample.


West BromwichPower station transformerThe specifications are very strict



Noise pollution control and prevention measures of dry-type transformer

Focus on Development.Dry type transformer manufacturer

In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

What is the reason for the shutdown of power transformer?

West Bromwich.In order to better carry out the experiment of power transformer oil, it is necessary to sample the power transformer oil. The sampling work should be carried out on a dry sunny day. The commonly used containers and sampling methods during sampling do immediate harm to whether the specific quality of the oil can be truly reflected. The oil sample for AC voltage withstand test shall not be less than 0.5kg,West BromwichScb14 dry type transformer,West BromwichInternal structure diagram of oil immersed transformer, and the oil sample for simplified experiment shall not be less than 1kg.

After sampling, bind the laminated glass stopper firmly with clean paper or cloth to prevent dirt and water from contaminating the bottle stopper.

The first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.