Wu QiangMobile hydraulic boarding bridgeCultivate industry scientific literacy

announcer:hp161HP196399230 release time:2024-03-05 10:52:35

These are the options for hydraulic oil for mobile boarding bridges.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, and foot of the slope, especially for the simple boarding bridge.

Wu Qiang.Application of hydraulic boarding bridges: Hydraulic boarding bridges can be widely used in docks, platforms, warehouses,Wu QiangHydraulic fixed boarding bridge, etc. according to user needs. Special designs can be made in terms of external dimensions, load, etc. The fixed boarding bridge is installed on the side of the cargo platform, flush with the ground and side of the cargo platform. The bridge deck of a fixed boarding bridge can tilt up and down, and its outer end can be higher or lower than the plane of the cargo platform, making it equal to the height of the carriage. There is a flip board at the top of the bridge, which automatically attaches to the edge of the carriage, ensuring a smooth passage between the cargo platform and the carriage.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.

.Hydraulic boarding bridges should strictly adhere to the principle of being overweight, as overloading may cause damage to objects; Working on a lifting platform without protective barriers may cause personnel to fall and cause casualties.

During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.

Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!


Wu QiangMobile hydraulic boarding bridgeCultivate industry scientific literacy



Open the manual valve, slowly lower the boarding bridge, and secure more than 90% of the lip plates at the bottom of the container.

Keep the hydraulic boarding bridge system clean: regularly replace the oil and filter. Good hydraulic oil contains various additives that can prevent oil deterioration or blockage of system components. However, the oil should be replaced regularly to ensure that the additives are effective. The filter can only absorb a limited number of dirt particles and other impurities from the oil. Replace the filter according to the recommended cycle to keep the system clean.

When it comes to fixed hydraulic boarding bridges, I believe

production.When working on the hydraulic boarding bridge, the support legs must be extended, and the support leg bolts must be adjusted to ensure that the lifting platform is stably stressed on the support legs and kept horizontal; During the lifting process and in the lifting state, the lifting platform must not be moved, and it is strictly prohibited to shake on the lifting platform. If there is an abnormal sound during the operation of the hydraulic boarding bridge, it should be stopped immediately for inspection to avoid causing serious damage to the lifting platform; Before use, check whether the electrical equipment is normal; All shaft pin oil holes must be oiled before each use. Before use, it is necessary to perform no-load lifting and check whether the hydraulic system is normal; The load of the workbench should not exceed the rated value,Wu QiangVehicle mounted boarding bridge, and it should not be subjected to intense manual shaking; The hydraulic oil in the oil tank must be replaced every 500 hours of operation.

Reason for the lifting table not lowering: The lowering valve is malfunctioning, and the lowering speed valve is out of adjustment. Solution: When pressing the lowering button, check if the lowering valve is energized. If there is no electricity, troubleshoot the lowering valve itself or replace the lowering valve. The lowering valve should be kept clean.

Install a 5m high protective railing around the foundation pit of the simple boarding bridge, with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, without the need for power supply, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support support first and then excavation, motor not rotating no overbreak&rquote; The principle of.


Wu QiangMobile hydraulic boarding bridgeCultivate industry scientific literacy



Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

How many?.Portable hydraulic press boarding bridge: It is a widely used type, suitable for places where loading, unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms warehouses, etc

Usage environment: Able to adapt to specific working environments, such as working in highly corrosive, high-temperature, and low-temperature environments.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.

Wu Qiang.The length of the electric hydraulic boarding bridge is generally about 10 meters, and the bearing weight varies depending on the tonnage. It is 10500mm for 6 tons, 11200m for 8 tons, and 11300m for 10 tons. It is very suitable for placement on the ground in open spaces.

Common&quo; Streamline” Open joint planning, with a welding area more than three times that of other traditional pipeline joints, greatly extending the service life and protection life.

Is the boarding bridge easy to use? Those who have used the boarding bridge know that it is a very useful mechanical equipment, which brings great convenience to the logistics industry and some industrial factories that need to load and unload goods. Some enterprises also value the development prospects of the boarding bridge and set up factory boarding bridges. High priced and various specifications of boarding bridge manufacturers provide timely supply, with high cost-effectiveness, and has become the preferred brand for many wire products. Welcome to choose!