Garman LakeHydraulic electric lifting platformWhat are the implementation standards

announcer:hp695HP135175170 release time:2024-03-04 13:32:01

full consideration should be given to whether the on-site environment meets the operating conditions of the crane.

When personnel enter the interior of the lifting platform for maintenance of outdoor elevators

Maintain a smooth access road for external construction elevators and sufficient parking space for equipment. When using a crane for auxiliary installation, they must hang the elevator to prevent sudden lowering of the platform and causing casualties.

Garman Lake.The brake operators of each mechanism on the equipment should regularly inspect and adjust the clearance of the brake pads and wheels ensuring flexibility and reliability.

Every month, it should be ensured to add butter twice to the transmission position where the grease nipple is located. For areas where butter cannot be added, it is necessary to clear the oil circuit or replace the grease nipple until butter can be added. Otherwise, if encountering an unsolvable problem with a hydraulic lifting platform, it is better to produce it quickly and conveniently, otherwise the moving parts in the system will accelerate wear.

Regular refueling is necessary for maintenance of the elevator: During the use of the elevator,Garman LakeHydraulic straight top lifting platform, due to the large load, there is also significant friction between various components, especially the elevator chain and elevator shaft pins. It is necessary to ensure that an appropriate amount of oil is added before each use to ensure flexibility and non jamming during operation. If the elevator is in operation and once&quo; appears; Squeak and Squeak&# quo; The friction sound can be basically determined to be due to a lack of oil in the elevator. It is necessary to immediately stop working and investigate the cause, and cannot forcibly operate, which can easily cause unforeseeable hidden dangers. Summary: Regular refueling is not allowed when maintaining the elevator.


Garman LakeHydraulic electric lifting platformWhat are the implementation standards



Preparation before folding and installation of the elevator. Carefully prepare a special construction plan for installation and provide safety technical disclosure to the installation personnel.

Having a high social status, it has now become an irreplaceable part of our mainstream goods. And the hydraulic pump station is the heart position of the lifting machinery, which extremely tests the professionalism and attention of the operator. It is our common responsibility to inspect it and ensure the daily use of machinery. Let's take a look at several common sense issues: the elevator manufacturer's point is to ensure the correctness of the power connection, and there should be no misconnection or leakage; Pay attention to cleaning work in daily life and do not allow stains to corrode it; When standing still,Garman LakeCustomized hydraulic lifting platform, regular maintenance should be carried out to prevent the impact of rain and snow weather; Overloading is the first thing that operators must comply with; Iron Law&# quo;; The adjustment of the solenoid valve cannot be done arbitrarily and must be checked and certified by a professional organization; Especially when conducting outdoor operations under high temperatures, it is necessary to always pay attention to the abnormalities of the pump station; It is very normal for us to encounter some problems when using hydraulic boarding bridges, as long as these problems are not very serious, we don't have to worry too much. However, when there is a problem with the hydraulic boarding bridge, only a timely solution is the correct response. Below is an introduction to some common faults of the hydraulic boarding bridge and specific solutions: the hydraulic boarding bridge must be repaired while hanging and supporting the working platform of the lifting platform to avoid sudden descent of the lifting platform, causing unnecessary casualties; 2. Do not adjust the overflow valve arbitrarily. Because every component in the hydraulic system operates at a specified pressure, once the relief valve is adjusted, it may cause abnormal operation of the hydraulic system, causing unnecessary damage to people, machines, and objects; Non professional personnel are not allowed to disassemble electrical appliances at will to prevent electric shock or incorrect connection.

The lifting platform has been inspected and debugged before leaving the factory,Garman LakeAluminum alloy hydraulic lifting platform, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.

Create brilliance.Regularly check the connection of each part of the hydraulic elevator, and tighten it if there is any looseness. The tightness of the body connecting bolts should be checked when the body is under pressure, and all connecting shafts must have split pins and be sufficient.

Replace with new oil and do not intermittently use old oil, otherwise the moving parts in the system will accelerate wear.

Loosening: The motor fan makes a sound when it rotates. If the screws that fix the motor are loose, coupled with its own vibration, the motor collides with other components, resulting in a sound; The joints of each pin shaft are dry, lacking oil, and there is hard friction between the iron parts, which not only damages the components but also produces abnormal noises. Therefore, the editor should emphasize again that timely maintenance and frequent refueling are important; If the hydraulic lifting platform does not rise, there is air in the hydraulic oil. You can open the exhaust hole, replace it in a timely manner; Motor reversal: Check for wiring errors; (Manufacturers of hydraulic lifting platforms who do not understand electricity in a timely manner)


Garman LakeHydraulic electric lifting platformWhat are the implementation standards



Familiarity with the usage process and without a doubt, this is the first thing to understand. There are two ways to understand it: first, carefully read the user manual provided by the manufacturer when the hydraulic lifting platform leaves the factory; The second is the equipment that needs to be installed. A professional installation technician will be dispatched to install the hydraulic lifting platform. After the installation is completed, relevant users will be trained on the operating process and safety precautions of the hydraulic lifting platform, and some maintenance matters in the future will also be explained; What should be paid attention to during the running-in period when using hydraulic lifting platforms? Check the wear of components. For newly processed and assembled components, there may be subtle deviations in shape and size that require a period of time for running-in. Therefore, during the running-in period it is necessary to pay attention to whether there is any rapid wear. If there is any, the manufacturer of the hydraulic lifting platform should handle it in a timely manner to avoid equipment failure; Work between the pins and bearings to ensure that they are not worn, and add some engine oil or grease appropriately; Confirm if there is any noise during the running-in period. If it is found that the hydraulic lifting platform is noisy during operation, there is no need to worry in the early stage. If there are no major problems, run it several times more. After the running-in, the noise will naturally disappear. However, if there is noise for a long time and no signs of fading please make sure to promptly produce it and solve the problem; Regularly check if the components are loose. Before use, check if there are any signs of looseness in screws, nuts, retaining rings, oil pipe joints, etc. If there are any, please reinforce or replace them in a timely manner to avoid accidents.

Finance Department.The product has a sturdy structure, a large load-bearing capacity, smooth lifting, simple and convenient installation and maintenance, making it an ideal and economical cargo conveying equipment for replacing elevators between low floors. The editor will tell you about the level

Hydraulic pump station: domestic lifting platform dedicated pump station, Italian imported pump station with external protective devices: organ m type, mesh type, and iron plate sealed type.

Operating cost advantage: Low failure rate. Due to the use of advanced hydraulic systems and good methods, it is driven by the pressure generated by its own weight, which greatly saves energy.

Garman Lake.What are the maintenance rules for the mechanical equipment of hydraulic elevators? The brakes of each mechanism should be regularly inspected and adjusted to ensure flexibility and reliability. On the friction surface, there should be no dirt present, and any dirt must be washed off with gasoline or thinner.

When conducting high-altitude operations on dangerous edges such as roofs, suspension bridges, slopes, or cliffs, guardrails or safety nets should be installed on the side facing the air or safety belts or ropes should be used.

The lifting platform has been inspected and debugged before leaving the factory, and all technical indicators meet the design requirements. When in use, only the power supply needs to be connected, and the hydraulic and electrical systems basically do not need to be adjusted.