The clock expression is used to indicate the phase difference correlation of the working voltage of the secondary side line. The phasor of the working voltage of the primary side line is used as the minute hand, the fixed finger is at 12 o'clock, and the phasor of the phase voltage of the secondary side is used as the second hand.

High voltage fuse of transformer breaks one phase;

Saloniki.The grounding resistance of, high voltage and bottom voltage shall not be less than 70% (10m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed 2%, which shall not exceed 2% compared with the last accurate measurement result.

When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time,SalonikiTransformer and box transformer, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.

.Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline, and the water can be evenly distributed from the bottle, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a 105 ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.

What is the reason for the shutdown of power transformer?

According to the condition of cracks, galvanized iron wire can be punched into the leakage or riveted with hammer. Then clean the leakage point with toluene and seal it with raw materials. Coated sand casting eyes can be sealed with raw materials immediately.


SalonikiPower transformer test guideFactors prone to stomata



In the whole process of transmitting electromagnetic energy in the power supply system, it will inevitably cause the loss of voltage and output power. When transporting the same output power, the voltage loss is inversely proportional to the voltage,SalonikiNo load loss of dry-type transformer, and the output power loss is inversely proportional to the square meter of voltage. The transformer is used to increase the voltage and reduce the closing damage.

In fact, apart from the application of the Finance Bureau, the industry has been trying to formulate and upgrade transformer commodities according to the specifications, so as to promote the improvement of energy consumption level of transformer commodities.

For no-load impulse closing of transformer, pay attention to the following matters:

Respect for customers.The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.

Power transformer

Oil leakage of bolt or pipe external thread


SalonikiPower transformer test guideFactors prone to stomata



Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below 0.2%, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube, carry out it twice and then draw the oil sample.

From the appearance, the packaging types are different. The transformer core and electromagnetic coil can be seen immediately for dry-type transformer, and only the shell can be seen for oil immersed transformer;