Larosh on the Yonghe RiverTechnical parameters of scb12 dry type transformerMeticulous workmanship

announcer:hp122HP117294921 release time:2024-02-25 11:09:47

Oil leakage of porcelain pot and laminated glass oil level gauge

After tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.

Larosh on the Yonghe River.At that time, only a few companies in China could produce 500kV high-voltage transformers,Larosh on the Yonghe RiverTransformer device, and the market share of high-voltage transformers was basically monopolized by overseas leaders.

When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:

.For no-load impulse closing of transformer, pay attention to the following matters:

During no-load test run the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.

The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.


Larosh on the Yonghe RiverTechnical parameters of scb12 dry type transformerMeticulous workmanship



Before no-load impact closing, the pose period of overcurrent protection shall be set to zero, and the data signal circuit of steam vehicle relay shall be temporarily connected to the pull-in circuit.

How to maintain dry-type transformer?

Operation and maintenance management of oil immersed transformer

management.After the oil is drained, all anchor bolts of the automobile oil tank at the upper end of the detachable oil cover shall be tied with the lifting jack, and the lifting point shall be on the common earrings or bolts. If necessary, the human resources traction belt shall be used as a guide.

Caused by sand holes and cracks. For crack leakage, drilling stop hole is a good way to remove in-situ stress and prevent widening.

Performance and main parameters of common metal composites, various welding processes and machinery and equipment, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, machinery and equipment of each process flow; The natural working environment is basically regulated.


Larosh on the Yonghe RiverTechnical parameters of scb12 dry type transformerMeticulous workmanship



The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; 0” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.

Application process.(I) the distance between the external contour of 10kV and below dry-type transformer and the surrounding guardrail or courtyard wall shall take into account the convenience of transportation and repair of dry-type transformer, and the distance shall not be less than 1m; At the angle with actual operation a spacing of more than 2m shall be reserved; If metal fence is selected, the metal fence shall be grounded and a warning sign shall be hung at a prominent position.

In order to better avoid overvoltage damage, a group of overvoltage maintenance high-voltage Arresters (such as y4cs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.

The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.

Larosh on the Yonghe River.Oil immersed transformer

With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed the accuracy of calculation conclusions can meet the needs of architectural design,Larosh on the Yonghe RiverPower converter transformer, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage, but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which greatly facilitates the design scheme of the oil immersed transformer and ensures the stability of operation.

It includes the performance and main uses of insulating layer materials, various insulating layer parts,Larosh on the Yonghe RiverDifference between power transformer and dry-type transformer, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.