SeihbergTrain boarding bridgeWhat part of the indicator

announcer:hp161HP196399230 release time:2024-02-19 10:32:31

The correct operation of the hydraulic boarding bridge is good maintenance, and how to operate it correctly. Let me briefly introduce the operating steps of the hydraulic boarding bridge, hoping to bring more help to everyone.

Install a 5m high protective railing around the foundation pit of the simple boarding bridge with a distance of no less than 1m from the protective railing to the foundation pit. The mobile boarding bridge only requires a single person to operate, and can achieve safe and fast loading and unloading of goods. Mobile boarding bridges are widely used in cargo platforms and mobile loading and unloading sites without loading and unloading equipment. They are auxiliary equipment for cargo loading and unloading that is used in conjunction with forklifts. The sequence of earthwork excavation must comply with design conditions and follow" Trenching support, support first and then excavation, layered excavation, no overbreak&rquote; The principle of.

Seihberg.The above content mainly shares the importance analysis of regular maintenance of mobile boarding bridges with everyone, hoping that everyone can take it seriously and not overlook it.

What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, the maintenance of the boarding bridge is very important. When it rains,SeihbergEmbedded boarding bridge, cover the boarding bridge with a rain cloth to prevent rusting and aging.

.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at 100% rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.

  1. Before use, check the boarding bridge for obvious damage such as cracks and broken wires.

During use, close attention should be paid to the condition of the equipment, and if there are any problems, the use should be stopped immediately.


SeihbergTrain boarding bridgeWhat part of the indicator



There is a lot of noise generated when using a mobile hydraulic boarding bridge. So,SeihbergBuy hydraulic boarding bridge, where are these noises caused? In fact, pump stations, and steel equipment are all sources of noise. Today we will analyze for you: 1. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations. After hearing the noise from the hydraulic boarding bridge, first check if there are any problems with the hydraulic pump station, motor, valve, and fixing device, and if the noise is caused by its vibration.

High altitude work platform vehicles are mainly divided into four types: scissor type straight arm type,SeihbergProduction of boarding bridges, curved arm type, the height can be adjusted according to the different vehicles of the goods, so that it can be level with the platform of the carriage for batch loading and unloading of goods. Due to the production of electric hydraulic boarding bridges by different manufacturers, the height of the design and manufacturing platform and the distance from the ground also vary, with heights ranging from 1000mm to 1200mm. The hydraulic lifting stroke height ranges from 300mm to 600mm, and the height of the electric hydraulic boarding bridge itself plus the stroke height is 1800mm, which can be met by almost all freight vehicles (with a general vehicle height of 1600).

The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.

Portable hydraulic press boarding bridge: It is a widely used type, suitable for places where loading, unloading, and transportation are not fixed or moving; Mobile hydraulic press boarding bridge: suitable for fixed and immovable goods such as ports, cargo platforms, warehouses, etc


SeihbergTrain boarding bridgeWhat part of the indicator



Do you know some of the working characteristics of hydraulic lifting boarding bridges? Today, I will take you to understand!

OK or not?.conduct.

Maintain the hydraulic system of the hydraulic boarding bridge. Keep the hydraulic oil of the hydraulic boarding bridge clean: Store the oil in a clean location, and be careful when changing or refueling. Only use a cleaning funnel equipped with a fine mesh filter to pour oil from the container into the oil tank. Of course, the oil you use should be the type recommended by the equipment manufacturer.

Open planning before placement makes it easy to clean up clutter.

Seihberg.The width of the boarding bridge also requires a certain width of its own. However, if the width is too small, it is not conducive to forklift loading and unloading of goods. If the width is too large, it can occupy a certain space, which is not necessary. So a reasonable width is necessary, usually the width of the electric hydraulic boarding bridge is 1800mm, 2000mm and 2100mm. The width of the bridge is divided into internal width and total width. As we have already mentioned, the internal width is the width of the passage, and the total width mainly refers to the width of the guardrails on both sides plus the width of the passage. The total width can be ignored in use, but everyone still cares about the internal width, which is the width of the channel.

Install drainage ditches on the ground near the pit of the simple boarding bridge, and take corresponding drainage measures for the top, surface, especially for the simple boarding bridge.

For slopes that are unstable or unstable after earthwork excavation, top-down segmented trench jumping should be adopted based on the geological characteristics and possible situations of the slope, and reverse construction or partial reverse construction should be carried out in a timely manner. It is strictly prohibited to excavate and explode indiscriminately.